Kishorn East Reclamation and Dry Dock Enlargement
Estimated value
—
works
Awarded value
—
Suppliers
1
Lots
1
1 awarded
Published
25 Jun 2025
Description
Kishorn Port Limited own and operate the Dry Dock facility at Kishorn. The existing Dry Dock is to be enlarged by forming a cutting 100m long and 60m wide into the rock foreshore. The rock material blasted and removed will be used to reclaim 8.5 hectares of foreshore land to the east of the Dry Dock. Access roads are to be repositioned around the new works. The Contractor will design the blasting elements of the Works.
Scope
- Reference
- P2525
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 45112300452482004524100045113000
- Contract locations
- Scotland
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Methodology, Programme & Quality Control | 30% | quality | — |
| Tender Price | 70% | cost | — |
Submission & procedure
- Procedure
- Restricted procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Awarded to