Provision of MRF Specialist Engineering Services
Estimated value
—
Awarded value
£1.5m
Suppliers
1
Lots
1
Published
15 Aug 2025
Description
NEWS currently owns and manages a Materials Recycling Facility (MFR) at its Costessey location. The plant operates 24/7/365 days per year. The waste that is treated or passed through the plant is critical to the successful operation of the waste production for the Councils identified above. The original CP plant was installed in 2003 and upgraded by machineX in 2014. The plant is a 35tonne per hour MRF with screens, air separators and 11 bailers. It has a mix of American, Canadian & UK equipment of mixed of ages. The MRF processes mixed dry recyclable materials, and the facility has the capacity to process up to 120,000 tonnes of mixed recyclables per year. NEWS is seeking suitably qualified bids for the servicing, planned preventative maintenance (ppm) and general maintenance of the whole plant along with reactive repairs and breakdowns. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=973763296
Scope
- Reference
- NGRP0106
- Commercial tool
- Standalone contract
- Contract dates
- 01 Sept 2025 to 31 Mar 2030
- CPV classifications
- 453510007130000071330000713330007133400071336000
- Contract locations
- East of England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Criterion 1 | — | price | 40.00% |
| Criterion 2 | — | quality | 60.00% |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.5m
Award date
13 Aug 2025
Contract start
28 Aug 2025
Contract end
30 Sept 2027