Works at Sandal Castle (Phase 1)
Estimated value
—
Awarded value
£228k
Suppliers
1
Lots
1
Published
03 Oct 2018
Description
Sandal Castle is owned by the Council and is a Scheduled Ancient Monument. The monument has public access provided by the provision of walkways, two wooden bridges, wooden steps to the top of the Keep and a wooden viewing platform. These were erected between 1999 and 2002. The wooden bridges and steps to the Keep have been closed to the public due to the requirement to undertake significant repair works. The extensive repair works to the site include the replacement of the main supporting frames and the other elements of the bridges, Keep steps and viewing platform which are currently structurally unsound, with timber. This essentially would result in damaged/rotten materials from the structure being replaced like for like. In addition, the works include the replacement of all decking on the structures with a more durable alternative and all of the balustrades and the deep cleaning of all metal infill panels. The additional works are designed to significantly reduce future maintenance requirements at the site, such as the regular replacement of wooden balustrades and decking, and remove the need to carry out similar substantial works as the remaining elements of the structures deteriorate further.
Scope
- Reference
- DN357541
- Commercial tool
- Standalone contract
- Contract dates
- 14 Oct 2018 to 21 Dec 2018
- CPV classifications
- 45212354
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 03 Sept 2018, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£228k
Award date
02 Oct 2018
Contract start
14 Oct 2018
Contract end
21 Dec 2018