Area 2 - A170 Sutton Bank 2023 Rock Face Maintenance
Estimated value
£65k
Awarded value
£25k
Suppliers
1
Lots
1
Published
24 Oct 2023
Description
The proposed Sutton Bank 2023 annual maintenance works include: 1. completion of the annual rock slope inspection of Upper Slope, Mid Slope and Lower slope and Cragg House slope by WSP engineer. 2. Clear vegetation and complete general scaling works from crest to the toe of the upper and lower rock face. 3. Routine maintenance of rock mesh / bolts to be undertaken, for example the removal of rock debris which accumulates in excess of 0.75m per metre run of mesh. 4. Inspection of 2022 remedial works to determine if advanced corrosion of any components is occurring.
Scope
- Reference
- 20231024170839-104117
- Total value
- £65,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 09 Sept 2023 to 15 Sept 2023
- CPV classifications
- 45200000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 15 Jun 2023, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£25k
Award date
25 Jun 2023
Contract start
09 Sept 2023
Contract end
15 Sept 2023
Awarded suppliers· 1 supplier
Awarded 25 Jun 2023 · Contract period 09 Sept 2023 — 15 Sept 2023
Other contracts from North Yorkshire County Council
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to iBex Technical Access· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| A20026 AREA 2 SUTTON BANK | contract | — | 01 Apr 2026 |
| Restoration works at Y Graig SAM, near Crickhowell, Powys | contract | — | 02 Mar 2026 |
| HBC Castle Hill Netting Works | contract | £85k | 09 Jul 2025 |
| A20026 AREA 2 SUTTON BANK | contract | — | 04 Jul 2025 |
| ESPH AB HBC Cliff Maintenance (ESPH557TI) - AWARD | contract | £151k | 14 Jun 2023 |
| Park Hall Lake- Spillway Wall Repairs- PGP2019/791* | call off | £64k | 02 Dec 2019 |
| ESPH AB Hastings Cliff Cave Strengthening Structural & Other Works (ESPH276TI) - AWARD | contract | £143k | 23 Jul 2019 |
| Works at Sandal Castle (Phase 1) | call off | £228k | 03 Oct 2018 |
| Newchurch Tunnels Cycleway - Rossendale - Rockface Inspection | call off | £56k | 31 Aug 2017 |
| ESPH SB Amber Cliff Works (ESPH169) - AWARD | contract | £233k | 03 Jul 2017 |