Provision of Layered Patching and Associated Repair Works Framework
Estimated value
—
Awarded value
—
Suppliers
0
Lots
4
Published
29 Aug 2025
Description
Norse Highways, a Trading division of Norse Eastern, undertake a programme of planned routine maintenance including patching, highways improvements and an element of privately funded work attached to the Highway. Norse Highways are seeking suitably qualified bids for the supply of carriageway layered patching, footway patching and pothole reinstating. Successful bidders will be appointed to a closed framework to provide the forementioned works services. There will be 4 (Four) available LOTS on the Framework, LOTS 1-3 are planned maintenance works, LOT 4 Carriageway Re-Surfacing, is larger scale work requirements that are not included in the planned works. Norse are seeking to appoint a number of service providers (up to maximum of 6 suppliers for each LOT) for LOTS 1-3, depending on responses. LOT 4 will not be restricted to a maximum number of suppliers awarded a place. Bidders can can submit a bid for one or all LOTS available, Bidders can be awarded to more than one LOT. The breakdown of the LOTs is provided as below: Lot Description LOT 1 Carriageway Layered Patching LOT 2 Footway Patching LOT 3 Pothole Reinstating/Patching AC10 or HRA 55/10 LOT 4 Carriageway Re-Surfacing To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=976930747
Scope
- Reference
- NGRP0084
- Total value
- £6,466,680 including VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 25 Sept 2025 to 25 Sept 2027Possible extension to 25 Sept 2029
Options to extend for up to 2 years incrementally for all LOTS.
- Main category
- works
- CPV classifications
- 452331424523322045233223
- Contract locations
- Norwich and East Norfolk, United KingdomNorth and West Norfolk, United KingdomEast of England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Price | — | price | 70.00% |
| Service Delivery | — | quality | 30.00% |
| Service Delivery | — | quality | 100.00% |
Participation
Conditions suppliers must meet to bid.
Bidders must hold an SSIP (Safe Contractor or Equivalent) to be in place prior to award of any work Bidders must hold or working towards NRSWA Street Works accreditation (Or Equivalent) to be in place prior to award of any work.
Bidders must hold an SSIP (Safe Contractor or Equivalent) to be in place prior to award of any work Bidders must hold or working towards NRSWA Street Works accreditation (Or Equivalent) to be in place prior to award of any work.
Submission & procedure
- Enquiry deadline
- 03 Sept 2025, 3:00 pm
- Submission deadline
- 08 Sept 2025, 10:00 am
- Submission address
- https://www.delta-esourcing.com/respond/N66WDBBV6R ↗
- Electronic submission
- Yes
- Procedure
- Open procedure
Lots · 4 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Carriageway Layered Patching | — | active |
| 2 | Footway Patching | — | active |
| 3 | Pothole Reinstating/Patching AC10 or HAR 55/10 | — | active |
| 4 | Carriageway Re-Surfacing | — | active |