Operator Console

NATIONAL ENERGY SYSTEM OPERATOR LIMITEDcontractFind a TenderRef ocds-h6vhtk-065afa32014L0024active
View buyer

Estimated value

services

Awarded value

Suppliers

1

Lots

1

1 awarded

Published

24 Feb 2026

Description

Design, Implementation and Support of the Operator Console solution as per the below: • Provision of a detailed solution design including the following components: • Operator Console desktop • 'Single pane of glass' display across monitors plus a touchscreen & stylus-enabled display sitting at the tabletop level • Seamless interaction and interoperability across a wide range of applications and networks within the 'single pane of glass' concept • No physical KVM or manual display-switching; the solution must be compatible with a single keyboard/mouse • Configurable role-based and user-based personalization of display layouts • Retention of existing physical telephony with capability to migrate to soft client, with the necessary headset connection at each console • Network connectivity as required within console, between consoles and from consoles to comms-room sources. • Design patterns to support extensibility of the solution onto additional desks or to additional control rooms at a future date • Implementation of Operator Console solution: • Deployment of desktop infrastructure (e.g. keyboard, mouse, displays, controllers, networking) onto existing ENCC physical desktops. • Deployment of end-user compute and associated hardware. This may be deployed under the control room desks or racked in a comms room environment, and we would like to explore both options as part of this RFP. • Deployment of highly-resilient connectivity between consoles and compute infrastructure (utilising existing networking suppliers). Strictly Confidential 4 • Implementation of the console across 3 sites: Control Room 1, Control Room 2 and the Control Training Unit. Please note that Control Room 1 and the Control Training Unit are at the same physical site, but different building areas, and Control Room 2 is at a separate physical site. • Early Life Support (ELS) period during the first 12 weeks following the project golive OR until agreed exit criteria are satisfied • Support of Operator Console solution • Provision of second-line support, on an 8-year time horizon as per the Agreement stated below. • 24-hour operational support including on-site response where required

Scope

Reference
ocds-h6vhtk-065afa
Commercial tool
Standalone contract
Main category
services
Contract locations
UK

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality75%quality
Cost25%cost

Submission & procedure

Procedure
Award procedure without prior publication of a call for competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to
PL
CH 02681563