Manchester Airport Pier 2 Phase 2 - TP2300 Shell & Core
Estimated value
£22.0m
Awarded value
—
Suppliers
0
Lots
1
Published
05 Aug 2022
Description
TP2300 Shell & Core The scope of these works includes: Design, manufacture/supply and install elements to construct Pier body onto pre-installed foundations as per MAG project team overall design. Pier body to consist of: - -Structural chassis consisting of elements placed on a recti-linear grid as defined in architectural layouts. -Preassembled/premanufactured flooring systems -Preassembled façade cassettes -Preassembled roofing cassettes -Premanufactured staircases -Premanufactured lift shafts -Premanufactured service risers Pier body construction to utilise overall preassembly of elements e.g. -Modular sections of structural chassis preassembled -Installing premanufactured floor, façade, and roof sections directly onto preassembled modular assemblies -Integration of other packages into preassembled modular assemblies e.g., MEP package 6300 – prefabricated plantrooms, Risers, Service modules etc The Pier will be constructed over a 17-month period from Q3, 2023 to Q4, 2024.
Scope
- Reference
- TP2300 Shell & Core
- Total value
- £22,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
If required, Extension of Time
- Main category
- works
- CPV classifications
- 452133304526000045223810452238004522382045223821452238224523510045235110452232104544300044211000
- Contract locations
- North West England
Submission & procedure
- Submission deadline
- 30 Aug 2022, 11:00 am
- Submission address
- https://esourcing.waxdigital.co.uk/MAG/SignIn.aspx?SCT=0bfb0434-b1be-4d9a-a110-1928876f6f4f ↗
- Procedure
- Negotiated procedure with prior call for competition