Wavell School Boiler Replacement - Phase 2 Main Boiler Room
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
08 Jul 2026
Description
The Project comprises of work within the existing main boiler room at The Wavell Secondary School located at Lynchford Road in Farnborough and include the following: Removal of existing boilers c/w flue system, water calorifiers complete with all existing heating pumps, heating, gas and domestic water services pipework and controls. Power flush of the existing heating system Installation of new heating boilers c/w flue system, new water calorifier, new heating and domestic water services pumps and pipework and all associated equipment Installation of new Controls and Control panel Installation of new gas distribution within boiler room and new gas safety panel and all associated equipment.
Scope
- Reference
- P13873
- Commercial tool
- Call-off from a framework
Submission & procedure
- Procedure
- Below threshold - award under framework
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—