Bootle Kirkby Cable Civils & Installation

SCOTTISH POWER UK PLCcontractFind a TenderRef ocds-h6vhtk-031c2532014L0025active

Estimated value

works

Awarded value

Suppliers

1

Lots

1

1 awarded

Published

03 Jun 2025

Description

Replace 19.429km of 132kV pressurised oil filled cables with 132kV non-pressurised XLPE solid cables Replace 19.429km of underground pilot wire with fibre optic cables Supply and install all ducting for the 132kV non-pressurised XLPE solid cables and fibre optic cables Complete all civils work (excavation, backfilling and reinstatement) associated with the installation Complete a single lane width reinstatement the length of the cable route (section approx. 1.8km) on the East Lancs road (A580) following the cable installation (Section 58 requirement) Scope of this work is for the cable civils only however we are optioning the cable installation costs. Replace existing outdoor sealing end structures at Bootle, Fazakerley and Gillmoss grid substations The existing modern non-pressurised XLPE solid cable sections along the two circuits including the outdoor sealing ends structures will be retained and reused. Drain, cut and cap of redundant oil filled cables and drain all associated oil tanks

Scope

Reference
ocds-h6vhtk-031c25
Commercial tool
Standalone contract
Main category
works
CPV classifications
71000000
Contract locations
UK

Submission & procedure

Procedure
Negotiated procedure with prior call for competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to
EL
CH 04450846