Eastern Region - Reactive & Small Schemes Framework
Estimated value
—
Awarded value
—
Suppliers
16
Lots
4
Published
10 Apr 2025
Description
Network Rail procured a framework for Reactive and Small Scheme works covering its building and civil assets within the Eastern Region. The types of works to be procured under the framework will be reactive works and small schemes that are of low complexity. Such works predominately impact the operation of the railway and will cover the following categories of works: Reactive call outs (Emergency & Urgent) Planned Preventative Maintenance works (PPM) Small schemes The Reactive and Small Schemes framework is envisaged to be the Eastern Region's route to market to deliver such projects and requirements under NR's Strategic Business Plan during CP7. The framework will be lotted as outlined below covering the geographical scope of the Eastern Region (https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/): Lot 1 - Civil Assets (Covering North & East, East Coast and East Midlands Routes) Lot 2 - Civil Assets (Covering Anglia Route) Lot 3 - Building Assets (Covering North & East, East Coast and East Midlands Routes) Lot 4 - Building Assets (Covering Anglia Route) To ensure supply chain resilience NR will retain the flexibility to allow Suppliers to work across Lots but only restricted to their specific discipline. This will only apply in instances where it has been deemed by NR that Suppliers within the relevant Lot under the same discipline cannot fulfil Network Rail's requirement(s). The initial term of the framework is 5 years with the option to extend for a further two periods of one year each. The indicative values provided for each of the Lots are estimates only, these are based on CP7 Strategic Business Plan budgets rather than delivery plan values. As such, they are not guaranteed and do not act as a minimum or maximum workbank value for the control period or a volume guarantee. The maximum value of the framework exceeds the combined value of the lots, this is so as the value is inclusive of the estimated values of optional extensions for the framework. Examples of work types to be covered and delivered under the scope of the framework include (but are not limited to): o Geotechnical - small scheme emerging works (from reactive), Maintain KVLs o Maintenance of foot bridges, under bridges, overbridges, tunnels, culverts, structural integrity o Rock cuttings, soil cuttings, earthworks first response etc o Buildings - small scheme emerging works (from reactive) o Structures - small scheme emerging works (from reactive), Structural integrity Negotiations to be conducted as part of the tender process will relate to the price element only. Participants will have an opportunity to update the pricing elements of their tenders following negotiations. Initial Tenders will be evaluated but feedback will not be shared with participants. Only feedback on Final Tenders will be shared following completion of evaluation of the tenders.
Scope
- Reference
- https://www.networkrail.co.uk/
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 4510000045200000452133214522111245221220452331614523325371332000452100004521330045300000
- Contract locations
- UK
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| — | — | price | — |
Submission & procedure
- Procedure
- Competitive procedure with negotiation
Award details· 16 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 4 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Lot 1 - Civil Assets (North & East, East Coast & East Midlands) | £372.1m | cancelled |
| 2 | Lot 2 - Civil Assets (Anglia) | £102.3m | cancelled |
| 3 | Lot 3 - Buildings (North & East, East Coast and East Midlands) | £198.6m | cancelled |
| 4 | Lot 4 - Buildings (Anglia) | £96.0m | cancelled |
Award 1· 1 supplier
Awarded —
Award 2· 1 supplier
Awarded —
Award 3· 1 supplier
Awarded —
Award 4· 1 supplier
Awarded —
Award 5· 1 supplier
Awarded —
Award 6· 1 supplier
Awarded —
Award 7· 1 supplier
Awarded —
Award 8· 1 supplier
Awarded —
Award 9· 1 supplier
Awarded —
Award 10· 1 supplier
Awarded —
Award 11· 1 supplier
Awarded —
Award 12· 1 supplier
Awarded —
Award 13· 1 supplier
Awarded —
Award 14· 1 supplier
Awarded —
Award 15· 1 supplier
Awarded —
Award 16· 1 supplier
Awarded —
Total lots
4
Awarded
4
Estimated total
£769.0m
Awarded total
—
Lot 1 - Civil Assets (North & East, East Coast & East Midlands)
Start
—
End
—
Estimated
£372.1m
CPV
Lot 2 - Civil Assets (Anglia)
Start
—
End
—
Estimated
£102.3m
CPV
Lot 3 - Buildings (North & East, East Coast and East Midlands)
Start
—
End
—
Estimated
£198.6m
CPV
Lot 4 - Buildings (Anglia)
Start
—
End
—
Estimated
£96.0m
CPV
Other contracts from Network Rail Infrastructure Ltd· 10
Most recent notices published by the same contracting authority.
| Title | Type | Value | Published |
|---|---|---|---|
| 421018.95 | contract | — | 28 Apr 2026 |
| New On Track Machine Multi-Purpose Vehicle (MPV) Fleet Preliminary Market Engagement | contract | £256.0m | 22 Apr 2026 |
| Princes Exchange, Leeds – Managing Agent & Estate Management Services | contract | £650k | 21 Apr 2026 |
| Preliminary Market Engagement Regarding FRMCS Advisory Services | contract | £15.0m | 21 Apr 2026 |
| IPDR - Alstom Turbostar - Onboard ETCS Fleet Fitment Contract | contract | £234.0m | 27 Mar 2026 |
| Environmental Services | contract | £830k | 19 Mar 2026 |
| North and East Digital Twin | contract | £2.3m | 19 Mar 2026 |
| North and East Digital Twin | contract | £2.3m | 19 Mar 2026 |
| Application Hosting and Technical Support of ARMS, Landlord's Consent and Retail Certificate Collection | contract | £495k | 17 Mar 2026 |
| York Central - Queen StMSCP | contract | — | 10 Mar 2026 |
Other contracts awarded to Amalgamated Construction Limited· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Form A Design Works | call off | — | 17 Jun 2026 |
| Form A Design Works | call off | — | 15 Jun 2026 |
| HRE - DUH/44 - Holbeck to Bowling - Scrap Yard Bridge | contract | £37k | 12 Jun 2026 |
| HRE - SDK/63AL - Bradford St. Dunstans N&E Jct to Keighley - Keighley Goods Tunnel | contract | £12k | 22 May 2026 |
| HRE - HMF/3 - Holmfirth - Brockholes - New Mill Road | contract | £49k | 21 May 2026 |
| HRE - SBY/3 - South Bishopley Branch - WhiteKirkley | contract | £24k | 18 May 2026 |
| MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 2 (Sheepway and Old Station Road Bridges) | contract | £1.5m | 07 May 2026 |
| MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge) | contract | £312k | 07 May 2026 |
| MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 1 Highways Contract | contract | £1.9m | 07 May 2026 |
| Minor Engineering Works Framework Contract 2026-2030 | contract | — | 17 Mar 2026 |