09TS Victoria Line Supply of Vertical and Lateral Dampers
Estimated value
—
Awarded value
£524k
Suppliers
1
Lots
1
Published
07 Jul 2026
Description
This is a goods only requirement estimated to be circa £559,345 for the supply of 1480 vertical and 729 lateral dampers to support the 09TS Victoria Line Fleet Heavy Overhaul Program Lift (HOPL) project. . These dampers are critical suspension components connecting the bogies (wheelsets) to the car body, primarily to absorb vibrations, control excessive movement, and ensure a smooth stable ride by managing vertical bumps and side-to-side (lateral) swaying, boosting passenger comfort and reducing noise. The dampers work together to isolate the car body from track imperfections, especially important for faster high frequency lines.
Scope
- Reference
- WS2825603201
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Direct award
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£524k
Award date
—
Contract start
20 Jul 2026
Contract end
21 Oct 2028