Nant y Mwyn 25-26 Scour Protection Works
Estimated value
—
Awarded value
£151k
Suppliers
1
Lots
1
Published
30 Jan 2026
Description
The purpose of these works is to prevent the Nant y Bai watercourse from continuing to scour (causing active erosion of) spoil heaps that make up its banks and causing mobilisation of metal-rich spoil into the watercourse. It is proposed to install a mixture of scour protection interventions including rock filled rolls and bags, geotextile matting and wooden stakes at a number of discrete areas along the bank to stabilise the spoil and prevent ongoing erosion by the Nant y Bai. We would welcome input from the Contractor regarding current design methodology based on previous experiences. The Works comprise the following: • Install scour protection measures in accordance with the drawings; • Install slope stabilisation measures in accordance with the drawings; • Supply and install 150No. rock filled bags as specified on the drawings and as directed on site to provide scour protection in Areas 3, 5 and 6; • Translocate Purple Moor grass into the working area in accordance with the drawings. The source of Purple Moor grass to be agreed with the ecological supervisor but shall be within the Site; • Install silt traps in accordance with the drawings; • Install an overland pipe with associated capture structure and outfall structure in accordance with the drawings; • Deliver plant and materials along designated routes to limit impact on the protected ecology and provide any equipment necessary to minimize the impact on the designated routes. This may include helicopters to aid in load lifting and placement of rock roll bags; and • Plan and execute temporary flow diversion measures to enable the Works in the river bed to be completed. The Works must be carried out, including transportation of plant and materials, in a way that: • Does not cause undue harm to the local ecology, including plants, trees and particularly the protected Calaminarian habitats (comprising metallophyte flowering and non-flowering plant species); • Does not damage local heritage features, including historic mining structures and artefacts; • Does not cause undue disruption to the local community; • Does not cause damage to existing services; • Does not cause damage to the forest track road, • Is in accordance with the relevant Environmental Action Plan (EAP) as prepared by the Mining Remediation Authority and agreed with NRW.
Scope
- Reference
- CA18/2/1/127
- Commercial tool
- Standalone contract
- Contract dates
- 19 Jan 2026 to 02 Mar 2026
- CPV classifications
- 45112450
- Contract locations
- Wales, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£151k
Award date
29 Jan 2026
Contract start
16 Feb 2026
Contract end
29 May 2026
Awarded suppliers· 1 supplier
Awarded 29 Jan 2026 · Contract period 16 Feb 2026 — 29 May 2026
Other contracts from Mining Remediation Authority
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to SANCTUS LIMITED· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Nant y Mwyn 25-26 Scour Protection Works | contract | — | 03 Apr 2026 |
| The Provision of Habitat Improvement Works | contract | — | 02 Dec 2025 |
| The Provision of Habitat Improvement Works | contract | — | 02 Sept 2025 |
| Demolition Services & Site Enabling Works Framework | contract | £3.3m | 28 Mar 2025 |
| Demolition Services & Site Enabling Works Framework | contract | — | 28 Mar 2025 |
| Worcestershire and West Midlands Development Framework - April 24 | contract | £25.0m | 20 Nov 2024 |
| Worcestershire and West Midlands Development Framework - April 24 | contract | — | 20 Nov 2024 |
| Sanyo and Servitec Site Remediation | contract | £1.4m | 05 Jul 2024 |
| BSH/CEN/Temple Island - Remediation, fill and utilities enabling works | contract | £4.6m | 31 Jan 2024 |
| ERDF Funded - Tender for Main Contractor for River Cole and Tyseley Energy Park - Creation of Community Commons Project | call off | £275k | 15 May 2023 |