e-ITT - Hill Head Coastal Protection Works Project Phase 2
Estimated value
—
Awarded value
£525k
Suppliers
1
Lots
1
Published
29 Jun 2017
Description
The works subject to this procurement comprise of Phase 2 of the Hill Head Coastal Protection Project. The works are to be undertaken during the summer of 2017, see WI 500, and comprise the construction of a new sheet pile wall with concrete capping beam approximately 150m long to replace the existing failed defences. The Works also comprise of raising of planking levels to Groynes 43 to 50 (inclusive), along the specified frontage at Hill Head. The Works will increase the height of the groyne field by adding extra timber planks, to the existing structures only, no raising of timber piles are required. This area is generally called the "Giblet Ore Site" within the Works Information. The seawall is adjacent environmentally sensitive and designated sites which require mitigations by the Contractor as identified within the Construction Environmental Management Plan [CEMP] contained within the Site Information
Scope
- Reference
- FAR001-DN240250-60512603
- Commercial tool
- Standalone contract
- Contract dates
- 25 Jun 2017 to 28 Sept 2017
- CPV classifications
- 45243000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 06 Mar 2017, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£525k
Award date
18 Apr 2017
Contract start
25 Jun 2017
Contract end
28 Sept 2017