Muck Away Haulage
Estimated value
£300k
Awarded value
—
Suppliers
0
Lots
1
Published
09 Sept 2025
Description
The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North. Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety. The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions. The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists. Other construction works include but not limited to the following: -2no. underpasses for the M3 mainline and A34 Northbound -1no. pedestrian subway -9no. MS4s, 1no. long span and 1no. portal gantries -Footbridge over the River Itchen -6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation -Site wide vehicle restraint barrier installation The scope of the works required is for the removal of arisings from the site including concrete, asphalt and inert materials.
Scope
- Reference
- Muck Away M3J9
- Total value
- £300,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 19 Oct 2025 to 19 Oct 2027
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 19 Sept 2025, 4:00 pm