LPS CAS - Design, Build, and Installation of a Bridle Footbridge (South Ribble) - RFQ 15291559
Estimated value
£100k
Awarded value
£150k
Suppliers
1
Lots
1
Published
11 Oct 2021
Description
The proposed footbridge connects bridleway 37 and bridleway 79 along the south bank of the river Ribble in South Ribble. This is a replacement to the previous footbridge which suffered storm damage in February 2020 and was subsequently demolished. The footbridge will carry pedestrians, cyclists, and horse riders over a tributary of the River Ribble. The bridge geometry is 20m span, 18.2m clear span between supports, 3.5m clear width between parapets and 1.8m parapet height. The contract will include the design, fabrication, delivery, and installation of the bridge. This includes the provision of suitable bearings and a holding down arrangement. All other work including the installation of foundations and the provision of a working platform for a crane will be carried out by the Authority. Delivery and installation of the bridge is required by around Nov-Dec 2021. Details of the programme are contained in ITT Appendix 4.
Scope
- Reference
- JM/CAS/LCC/21/1208
- Total value
- £100,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 10 Oct 2021 to 31 Dec 2021
- CPV classifications
- 44212100 45221113 71322300
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 20 Aug 2021, 9:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£150k
Award date
05 Oct 2021
Contract start
10 Oct 2021
Contract end
31 Dec 2021
Awarded suppliers· 1 supplier
Awarded 05 Oct 2021 · Contract period 10 Oct 2021 — 31 Dec 2021
Other contracts from Lancashire County Council
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to Beaver Bridges Ltd· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| White Mill Footbridge Replacement | contract | — | 21 Aug 2025 |
| Tin Footbridge - Central Span Replacement | contract | — | 15 May 2025 |
| Provision of a replacement bridge at The Grange School | call off | £1.8m | 29 Jan 2025 |
| HRE - Millersdale North Viaduct CNB3/72A | contract | £1.3m | 17 Jun 2024 |
| HRE - MAR/40 - Ulverscroft Road' Overbridge Structural Infilling of East span | contract | £410k | 29 May 2024 |
| PLACE 106 - Longcliffe Station Bridge Replacement Longcliffe Nr Brassington Derbyshire | contract | £250k | 03 Oct 2022 |
| Congresbury Yeo Accommodation Bridge | call off | £1.4m | 17 Nov 2021 |
| CLOSED BRANCH LINES MAJOR WORKS - CKP/87 - INSTALLATION OF MULTIPLATE ARCH | contract | £140k | 11 Feb 2021 |
| Allerton Wath Bridge - Waterproofing & Surfacing | call off | £26k | 16 Nov 2020 |
| Low Easby Bridge - Waterproofing, Painting & Invert Repair | call off | £84k | 16 Nov 2020 |