Broadcast of the Time From NPL
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
15 Mar 2022
Description
Broadcast of the Time From NPL (formerly MSF 60kHz Standard Frequency & Time Service) We are purchasing the service to provide, operate and maintain the MSF signal at a carrier frequency of 60 kHz. The effective radiated power of the signal shall be sufficient to provide a minimum field strength of 100 uVolts / m at a distance of 1000km from the transmitter, and shall cover the whole of mainland UK. The contractor shall provide at least 2 frequency standards able to maintain the carrier frequency at 60 kHz to within 2E-12 (2 parts in 10 to the power of 12) over a period of 30 days without dependence on off-air reception of any signal and shall provide the equipment required to generate and to monitor the correct time and date code at the Transmission Station.
Scope
- Reference
- ocds-h6vhtk-03223d
- Commercial tool
- Standalone contract
- Main category
- services
- Contract locations
- UK
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| - | - | cost | — |
Submission & procedure
- Procedure
- Award procedure without prior publication of a call for competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—