Babbacombe Beach Road Stabilisation Scheme
Estimated value
£490k
Awarded value
£490k
Suppliers
1
Lots
1
Published
19 Nov 2020
Description
The existing retaining wall on the lower section of Beach Road is slipping down the coastal slope, which in turn is causing the carriageway to fail. There is currently a 3T weight limit on the road as a result. Therefore a new retaining structure is required to stop the road collapsing. The works comprise of piling into the existing carriageway behind the existing wall, and installing ground anchors to tie the piles back to stable ground. A new parapet wall is to be constructed along the top of the piled wall. A new kerb line is to be laid behind the new wall and the carriageway resurfaced.
Scope
- Reference
- TORB001-DN500434-91441752
- Total value
- £490,333.99 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Nov 2020 to 26 Feb 2021
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 29 Oct 2020, 12:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£490k
Award date
06 Nov 2020
Contract start
30 Nov 2020
Contract end
26 Feb 2021