Babbacombe Beach Road Stabilisation Scheme

Torbay CouncilcontractContracts FinderRef TORB001-DN500434-91441752SME suitablecomplete

Estimated value

£490k

Awarded value

£490k

Awarded 06 Nov 2020

Suppliers

1

Lots

1

1 awarded

Published

19 Nov 2020

Deadline 29 Oct 2020

Description

The existing retaining wall on the lower section of Beach Road is slipping down the coastal slope, which in turn is causing the carriageway to fail. There is currently a 3T weight limit on the road as a result. Therefore a new retaining structure is required to stop the road collapsing. The works comprise of piling into the existing carriageway behind the existing wall, and installing ground anchors to tie the piles back to stable ground. A new parapet wall is to be constructed along the top of the piled wall. A new kerb line is to be laid behind the new wall and the carriageway resurfaced.

Scope

Reference
TORB001-DN500434-91441752
Total value
£490,333.99 excluding VAT
Commercial tool
Standalone contract
Contract dates
30 Nov 2020 to 26 Feb 2021
CPV classifications
45000000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
29 Oct 2020, 12:00 pm

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£490k

Award date

06 Nov 2020

Contract start

30 Nov 2020

Contract end

26 Feb 2021