Section 38 Whixall Manor Drain Diversion Completion

Natural EnglandcontractContracts FinderRef S38 WMDDCSME suitablecomplete

Estimated value

£25k

Awarded value

£15k

Awarded 16 Sept 2024

Suppliers

1

Lots

1

1 awarded

Published

21 Nov 2024

Deadline 27 Aug 2024

Description

Summary of the S38 project Fenn's NNR Section 38, Reeves' Fields, is in the West Midlands near Whitchurch and Wrexham. It is situated towards the southeastern perimeter of the internationally important Fenn's, Whixall, Bettisfield, Wem and Cadney Mosses Site of Special Scientific Interest (S.S.S.I.), in the Fenn's, Whixall & Bettisfield Mosses National Nature Reserve (N.N.R.). The Marches Mosses BogLIFE Project (LIFE15NAT/UK/000786) terminated in March 2023, and now unfinished works are being tackled. The Project aimed to allow better control of water levels to enable wetland habitat to be restored on land which has been converted from peatland to peaty fields. Reeves's fields used to be peatland, and originally formed part of the south-eastern edge of Whixall Moss. In 2009 the Whixall Manor Drain, which was taking polluted and mineral-rich water up from local Cottages onto and across the centre of the NNR, was diverted nearer to the edge of the Moss but ended at a new culvert under the track leading north from Roundthorn Bridge, Whixall. The downstream 195m of the Diversion was left in the existing channel, with the intention to complete the diversion by excavating a new channel farther south during the BogLIFE Project. However, the Project was completed before this last part of the Diversion had been executed. Overall, this Scheme will rewet at least 4.25ha of deeper peats in Section 38 plus support water levels in adjacent Whixall Moss to the north. This Scheme involves: 1. Excavation of a new 210 m-long open channel nearer to the edge of the peat body. The open channel lengths will have a 1.0m bed width with 1:1 side-slopes. 2. Damming of upper length of existing course of Whixall Manor Drain. Damming of the drain will take place at 3 sites (D1, 6m long, D2 3m long, and D3 at 6m long). The first dam (D1) will be positioned immediately downstream of the upper end of the Diversion and the final dam will be upstream of the entry point into the Whixall Moss Main Drain. D1 dam will utilise surplus peat from the first 12m-long excavation of the Diversion. Dams D2 and D3 will use peat from shallow borrow pits. Each will incorporate a 300mm U-pipe to control water levels to allow for any future emergencies such as blockages in the new channel. To make D1 watertight it will also need L8 trench sheets. NE will supply all materials, which will need to be collected from the nearby Manor House NNR Base. The contractor will need a tracked excavator and one or two tracked dumpers. It is anticipated that this contract will be awarded for a period of 2 to 3 weeks to end no later than 02/10/24, unless there is substantial disruption from adverse weather.

Scope

Reference
S38 WMDDC
Total value
£24,999 excluding VAT
Commercial tool
Standalone contract
Contract dates
08 Sept 2024 to 17 Oct 2024
CPV classifications
92533000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
27 Aug 2024, 8:00 am

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£15k

Award date

16 Sept 2024

Contract start

08 Sept 2024

Contract end

17 Oct 2024