Fosse Way Pitch
Estimated value
£50k
Awarded value
—
Suppliers
0
Lots
1
Published
29 Jul 2024
Description
1. To form a medium duty path along the line of the attached plan. (Approximately 450m) 2. Finished pathway to be a minimum of 1200mm width 3. Dig out the path width to a depth of 150-200mm and move the excess spoil to a location at the east end of the site. The path will need to be dug out for the entire length. Existing surface is topsoil with grass cover. 4. Relocate excavated topsoil of the East end of the site and form into flat topped bund of maximum area and minimum height as per drawing. Weed treat and seed on completion. 5. Install rot treated timber edging, securely anchored to prevent displacement. 6. Lay fabric weed control and stabilisation layer. 7. Supply lay and compact 100mm min thickness base layer comprising crushed brick, crushed concrete or MOT approved stone material with a 50mm to zero granule size. 8. Provide and lay an asphalt wearing coarse comprising a 60mm base layer and a 20mm fine surface layer. Hot rolled and compacted ensuring a slight crowned centre to aid drainage. 9. Merge and feather new pathway to existing path at two points indicated on the plan.
Scope
- Reference
- Fosse Way Pitch
- Total value
- £50,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 18 May 2025 to 31 Jul 2025
- CPV classifications
- 45112500 45112710 45112711 45112712 45113000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 30 Oct 2024, 5:00 pm