Design Consultant for LINAC Bunker and Ward 9 Redevelopment
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
11 Sept 2025
Description
The Trust requires full design services up to RIBA Stage 4 for the construction of a new Linac bunker at Musgrove Park Hospital to support the 2028 Linac replacement programme and ensure uninterrupted radiotherapy services. The design must include associated patient areas such as reception, waiting, changing, and recovery spaces, and consider the feasibility of incorporating a new inpatient haematology ward to replace Ward 9, either integrated with or located nearby. The scope also includes advice on construction methods, including potential interim and permanent solutions aligned with wider site development plans, and provision of all necessary building services-heating, cooling, water, medical gases, power, and data-meeting clinical standards. All designs must comply with relevant HTMs and Trust policies.
Scope
- Reference
- SFT/AT/C365808
- Commercial tool
- Standalone contract
- Contract dates
- 24 Jul 2025 to 24 Apr 2026
- CPV classifications
- 71530000
- Contract locations
- UK, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Commercial Questionnaire | — | cost | 40.00% |
| Technical Questionnaire | including Social Value | quality | 60.00% |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—