Replacement of borehole water pump and pumphouse
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
23 Oct 2025
Description
Parsonage Down NNR (Shrewton, Wiltshire) require a replacement water pump and associated equipment to pump water from a bore hole . The pump must also come with a keraflo system to top water up from the mains water supply. The pump must be insulated and come with a replacement shed or housing. The pump is in the farmhouse garden which is accessible from the main drive. The pump replacement needs to happen whilst still providing water across the farm whilst the work is being carried out. The work needs to be completed before the end of march 2026.
Scope
- Reference
- NNR019/500
- Commercial tool
- Standalone contract
- Contract dates
- 01 Oct 2025 to 15 Mar 2026
- CPV classifications
- 42122130
- Contract locations
- South West England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—