Housing Solutions - Supply and installation of Fire Doors
Estimated value
—
Awarded value
£2.5m
Suppliers
1
Lots
1
Published
18 Dec 2025
Description
Scope and Delivery of Work: Mixed procurement (Goods/Works) focused on the supply and installation of fire door sets across our estate over a 3-4yr period. The successful tenderer will be expected to supply and install approximately 250 fire doors per annum inline with the Specification provided. We expect them to engage a Resident Liaison Officer (RLO) and liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works. Programme scale and duration: We intend appointing for an initial contract period of 3 years with the option to extend for a further 12 months. We operate a two year budget but estimate our 2026-27 - 2028-29 budget will be up to £1.8m for fire door replacements and we expect to maintain similar budgets in future years. Therefore we estimate the max term spend to be up to £2.5m. Geographical distribution: Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes (at least 70%), although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire. CDM: We will appoint the Quoin Consultancy as Principal Designer, successful bidder will be appointed Principal Contractor. We expect them to prepare the key documents and Quoin will check them against the regulations. Pricing: All relevant pricing is to be submitted via the Pricing Matrix as all-inclusive (meaning they must include all aspects required to supply and install full fire door sets). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract.
Scope
- Reference
- FD2025
- Commercial tool
- Standalone contract
- Contract dates
- 30 Aug 2025 to 30 Aug 2028Possible extension to 30 Aug 2029
Initial term of 3 years with a option to extend for a further year (Max term 4 years).
- CPV classifications
- 442212204534300045421131
- Contract locations
- South East England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 60% weighting has been assigned across 10 x Quality Questions (See ITT Document & Appendix 4B for more information) | quality | 60.00% |
| Price | 40% weighting has been assigned across 8 x Price Categories (See ITT Document & Appendix 6 for more information) | price | 40.00% |
Participation
Conditions suppliers must meet to bid.
The following Insurances will need to be in place in order for the contract to be awarded: Public Liability - £10m Employers Liability - £5m Professional Indemnity - £1m Requirement to adhere to GDPR Regulations. Draft JCT contract has been provided in attachments (Appendix 10). Financial Capacity will be tested. Please see attached ‘PSQ Economic & Financial Standing Mechanism’ + ‘PSQ Financial Standing Guide’ for how this will be assessed.
The PSQ contains the following Conditions of Participation (Pass/Fail): 1) Relevant experience and contract examples. 2) Requirement to be able to deliver services across HS estate (predominantly Maidenhead) and mobilise quickly. 3) Requirement to have a Safeguarding Policy in place for Children & Vulnerable Adults. 4) Requirement to provide assurance on continuity of supply/service from your critical supply-chain (providing at least one of the following: a Business Continuity / Disaster Recovery / Risk Management Plan). 5) Requirement CDM Regulations adherence & SSIP Membership. 6) Requirement for 3rd party accreditation - BM TRADA Q-Mark Fire Door Installation or FIRAS Installer Certification Scheme - Fire Doors (or equivalent). 7) Requirement Bribery Act adherence. 8) Modern Slavery Act adherence. 9) Requirement for Contractor (and any Sub-Contractor) to deliver all services under contract inline with Housing Solutions’ Approved Contractor Standards. 10) Requirement to Pass Conflict of Interest checks & Sign PSQ.
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£2.5m
Award date
18 Dec 2025
Contract start
19 Jan 2026
Contract end
18 Jan 2029