CPF1956-20 Resurfacing, Reconstruction, Patching, Recycling and High Friction Surfacing (HFS) Framework 2022 – 2026
Estimated value
—
Awarded value
—
Suppliers
14
Lots
3
Published
07 Jul 2022
Description
Resurfacing, Reconstruction, Patching, Recycling and High Friction Surfacing (HFS) Framework 2022 – 2026. The Framework will have 3 lots: Lot 1 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of the resurfacing and reconstruction and patching of carriageways, associated works and the disposal of arisings to licenced or approved facilities for either future re-use/recycling or disposal (no re-use/recycling of arisings in the works). Lot 2 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of hand patching, the installation of High Friction Surfacing (HFS), patching of existing HFS installations and associated works. Lot 3 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of the resurfacing and reconstruction of carriageways, associated works and the use of recycled materials either In-situ Cold Recycled Bitumen Bound (shallow depth (Retread), medium depth (Regen) and deep depth) or Ex-situ Cold Recycled Bitumen Bound (processing plant).
Scope
- Reference
- DN576379
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 45233000
- Contract locations
- South West England
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 60 | quality | — |
| — | 40 | price | — |
| Quality | 40 | quality | — |
| — | 60 | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details· 3 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 3 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Re-surfacing and re-construction and patching of carriageways, associated works and recycling | — | cancelled |
| 2 | Hand patching, the installation of High Friction Surfacing (HFS), patching of existing HFS installations | — | cancelled |
| 3 | Re-surfacing and re-construction of carriageways, associated works and recycling | — | cancelled |