Bridge Inspection Contract

Forestry Commission FCcontractFind a TenderRef ocds-h6vhtk-043b6f32014L0024active

Estimated value

services

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

20 Feb 2024

Description

Contract to carry out Principle, General & Special Bridge Inspections - record and report these inspections for a number of our category A and B bridges throughout Forestry England. All bridges undergo a 'General Inspection' at a maximum interval of every 2 years, replaced by a 'Principal Inspection' every 6 years. Additionally, there can be times when a further inspection is required outside of these timings, and this is referred to as a 'Special Inspection'. Work to include: A) desk top study to produce workflow plan with indicative methodology of inspection of each bridge for approval B) pre-inspection site visit for all bridges, including update of Forestry England risk assessments as needed - issue revised workflow plan for approval C) carry out inspections D) report findings E) optional additional structural analysis and design work to provide recommendations for repairs where defects are identified F) optional: call off extra inspections using day rates.

Scope

Reference
FCCN565
Commercial tool
Standalone contract
Main category
services
Contract locations
UK

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality (Meeting the scope) & Environmental Sustainability75quality
Price25cost

Submission & procedure

Procedure
Award procedure without prior publication of a call for competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end