Water Resource Management Plan (WRMP), Regional Plan and RAPID gate two assessment support to Ofwat

O F W A TcontractContracts FinderRef PROC.01.0752SME suitablecomplete

Estimated value

£199k

Awarded value

Awarded 05 Sept 2022

Suppliers

1

Lots

1

1 awarded

Published

22 Mar 2023

Deadline 01 Aug 2022

Description

We require at least four water resource specialists / engineers / asset managers to support the assessment of draft Water Resource Management Plans (WRMPs), regional plans and RAPID solutions for the period from 7 September 2022 to 7 June 2023. During September there will be a period of training and familiarisation. We require full time and/or part time at least 3 days a week average commitment from each staff member, although this may vary particularly during the familiarisation period in September. In general, this work will consist of a desk-based assessment of each of the received plans and submissions and appended documentation. It will support the development of RAPID's recommendations on gate two submissions and Ofwat's response to draft WRMP and regional plan consultations. We welcome consortium bids. Each of the Key Personnel will be working as part of structured assessment team and will report to a member of the RAPID and Ofwat teams. They will have access to the draft WRMP / regional plans and RAPID submissions supported by a number of appendices. The assessment will be carried out using a proportionate and risk-based approach using a framework that incorporates assessment criteria supported by a number of tests. We will provide training on the assessment framework, criteria and outcomes prior to the work commencing. The roles we are seeking to resource are described below. Engineering and technical test area support for WRMPs, regional plans and RAPID solution gate two assessments at Senior Consultant level. Assessment of the water resources engineering and technical aspects of the WRMPs, regional plans and gate two submissions received. The Key Personnel will be working alongside and reporting to RAPID and Ofwat staff. This assessment will support that of the existing Ofwat and RAPID engineering and water resources teams. The Key Personnel will be expected to join short on-line Ofwat team check-in and progress meetings several times a week. Responsibilities will include: • Assessment of the technical water resources aspects and CAPEX and OPEX costs of each of the WRMPs and options within, regional plans and gated submissions received. • Analysis of WRMP and regional plan table submissions. • Quality written outputs for inclusion in all consultation response documents and presentations. • Compliance with timetables/quality expectations.

Scope

Reference
PROC.01.0752
Total value
£199,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
06 Sept 2022 to 06 Jun 2023
CPV classifications
71800000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
01 Aug 2022, 10:30 am

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

05 Sept 2022

Contract start

06 Sept 2022

Contract end

06 Jun 2023