Repair works to chapel building, Crowlas Cemetery, near Penzance, Cornwall
Estimated value
—
Awarded value
—
Suppliers
0
Lots
1
Published
23 Mar 2022
Description
Full details at: www.ludgvan.org/quotes-invited-repairs-to-chapel-building-crowlas-cemetery/ Preparation phase 1. Construction of buried stormwater drainage soakaway. To bring run-off water from the roof away from the building, by a gulley at each side of the parking area. 100mm underground sewerage pipe. 2. Construction of parking area. To incorporate the soakaway and a turning area. To be surfaced with compacted 803 aggregate and a surface dressing of gravel. Main phase works: External structure - first window, northern side, keystone to be re-fixed and crack repaired - repointing, all external walls, existing to be replaced with natural hydraulic mortar (1 part NHL3.5 lime to 3 parts graded sand). No cement. All pointing to leave new mortar flush with adjoining. Chapel roof - replace rotten purlins with new - potentially other rotten timber to be replaced - replace tongue and groove ceiling cladding with new - replace any tiles removed and damaged with tiles to match existing Lean-to building - to be repointed and replace broken roof sheet - wooden door to be repaired/replaced - gutters and downpipes - failing fixings to be replaced - Doors and windows - repairs to sections of rotten timber in door and window frames. Missing sections of timber to be replaced. - Windows - re-glaze those without glazing Internal walls - the existing lime plaster to be removed and replaced with new lime plaster. Internal floor - replace concrete slab inside entrance.
Scope
- Reference
- LPC/01
- Commercial tool
- Standalone contract
- Contract dates
- 31 Aug 2022 to 30 Mar 2023
- CPV classifications
- 50000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 29 Apr 2022, 4:00 pm