Operational Property Inspections

NETWORK RAIL INFRASTRUCTURE LIMITEDcontractFind a TenderRef ocds-h6vhtk-066ad8Procurement Act 2023Utilities regimeclosed for bids
View buyer

Estimated value

£1.5m

services

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

16 Mar 2026

Deadline 29 May 2026

Description

This procurement is to deliver the Operational Property visual and detailed examination programme throughout Central Route and West Coast Mainline South Route for the remainder of Control Period 7, in accordance with the requirements of NR/L2/CIV/171 and NR/L3/CIV/006. The requirements for Operational Property assets are to mitigate the risk of functional failure of a Buildings asset which may result in health, safety, environmental or operational incidents. The top risks identified in operational property are due to failure of assets leading to: • Loss of safe environment; including objects falling from height and Mechanical & Electrical infrastructure failures • Slips, trips and falls at building assets • Train collision The output of the examinations will be used to derive the future budgets through scoping of planned preventative maintenance works to demonstrate examination compliance with the Office of Rail and Road (ORR).

Scope

Reference
ocds-h6vhtk-066ad8
Total value
£1,500,000 excluding VAT
£1,800,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
31 Jul 2026 to 31 Mar 2027
Main category
services
CPV classifications
71315300

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Methodolgy & ProgrammeQuestion 1- Resource, Quality and Availability The Tenderer’s submission must state whether they have the resources and capability to complete the package(s) within the timescales indicated. The Tenderer shall as part of their submission demonstrate how many persons within their organisation are suitably qualified to STE05 (or equivalent) and hold relevant competencies (PTS and Level C). In order to substantiate the Tenderer shall submit: a. A completed “Resource and Competency Matrix” Sheet (Competencies Document). Responses should give assurance of the following; • How many qualified staff do you have available to deliver the package to a compliant programme. • What is your current commitment from April 2026? • How many qualified resources do you have available in-house for that programme? And what would you subcontract? Question 2- Please submit outline statements of the methods by which it intends to execute the Services from time of award of Contract until completion. The Tender shall ensure that the outline Method Statement includes; - a clear statement of the Tenderer’s intended methods of working; - provides details of any contingency arrangements; - takes full account of train operations and any possession arrangements; and - gives full details of any preliminary/advance and temporary work requirements. Outline Programme Please submit an Outline Programme in bar chart format showing the major sequence of the various activities required, including mobilisation, start and completion of Services to meet the milestones/contract programme dates (i.e. 31st March 2027). The programme shall show all significant milestones, activities and durations sufficient and appropriate for a contract of the size and complexity described within this Invitation to Tender. The programme shall include any deliverables to be provided by Network Rail (if any). Due note shall be taken of available possessions, isolation and speed restrictions as stated in the tender documentation. Any inability to comply with the constraints imposed by the Rules of the Route and any variation required to the Rules shall be clearly stated herein. The Tenderer shall indicate in its submission those possessions, isolations and speed restrictions they intend to utilise for the Works.quality70.00%
Pricecost30.00%

Submission & procedure

Submission deadline
29 May 2026, 10:59 pm
Submission address
https://networkrail.bravosolution.co.uk/web/login.html
Electronic submission
Yes
Procedure
Competitive flexible procedure