Resurfacing of the Main Deck of the Tamar Bridge, including the north and south cantilever lanes.
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
25 Feb 2021
Description
Resurfacing of the Main Deck of the Tamar Bridge, including the north and south cantilever lanes. The successfully appointed Contractor will also be required to safely remove the existing installed series of illuminated lane studs and ensure resurfacing work is completed to the agreed programme, to allow for prompt installation of the replacement studs by the separately appointed supplier, as a key part of the overall resurfacing project. Included within the overall scope of requirements are expansion joint replacement and resurfacing of the Toll Plaza Area.
Scope
- Reference
- DN422865
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 45233251
- Contract locations
- South West EnglandSouth West England
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Price | 60% | cost | — |
| Quality | 40% | cost | — |
Submission & procedure
- Procedure
- Competitive dialogue
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—