Condensate Water Pipework System - Quantity Surveyor
Estimated value
—
Awarded value
£37k
Suppliers
1
Lots
1
Published
25 Sept 2025
Description
The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance. The existing system is designed to allow for one system to operate at any one time, not two systems. Therefore, only one system can be worked on at any one time. A Condenser Water bypass is to be installed within the Ground Floor plantroom. This is to allow for example system 1 chiller to operate with system 2 system, and vice versa. The project is currently at stage 4 and estimates a 52-week construction phase.
Scope
- Reference
- C387933
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Below threshold - limited competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£37k
Award date
07 Sept 2025
Contract start
25 Sept 2025
Contract end
31 Dec 2026