Condensate Water Pipework System - Quantity Surveyor

Guy's and St Thomas' NHS Foundation TrustcontractFind a TenderRef ocds-h6vhtk-05a25bProcurement Act 2023active
View buyer

Estimated value

Awarded value

£37k

Awarded 07 Sept 2025

Suppliers

1

Lots

1

1 awarded

Published

25 Sept 2025

Description

The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance. The existing system is designed to allow for one system to operate at any one time, not two systems. Therefore, only one system can be worked on at any one time. A Condenser Water bypass is to be installed within the Ground Floor plantroom. This is to allow for example system 1 chiller to operate with system 2 system, and vice versa. The project is currently at stage 4 and estimates a 52-week construction phase.

Scope

Reference
C387933
Commercial tool
Standalone contract

Submission & procedure

Procedure
Below threshold - limited competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£37k

Award date

07 Sept 2025

Contract start

25 Sept 2025

Contract end

31 Dec 2026

Awarded to