Playground and Sports - Synthetic turf

London Borough Of IslingtoncontractContracts FinderRef 85DCE4D8-DBF8-46A1-BF70-1E906473ADABSME suitablecomplete
View buyer

Estimated value

Awarded value

£199k

Awarded 19 Aug 2025

Suppliers

1

Lots

1

1 awarded

Published

20 Aug 2025

Deadline 22 Jul 2025

Description

To carry out the replacement of the 3G football pitch at Whittington Park as per the scope of work below: Pitch development scope of works*: Site set up Preliminary costs (messing and welfare) Remove existing synthetic turf and disposal Careful inspection of existing in situ shockpad Clean facility footprint Install new infill migration mitigation features (500mm minimum height kickboard panels, 2Nr boot cleaning stations at players entrance, 2Nr boot cleaning grates (two doubles) Localised repairs to pitch base in eastern goalmouth and associated shockpad works above the base repair Install new SBR rubber infilled 3G synthetic turf layer (minimum 50mm pile length) Site entrance reinstatement New pitch surfacing system to meet FIFA Quality standard and the completed pitch will be tested for inclusion on FA pitch register. With potential works to include (extra over costs required - not to include in tender sum): Removal and installation of new shockpad if existing shockpad found not to be suitable (tenderer to propose type of shockpad to be used) Extra over cost for new alternative infill carpet and shockpad system to meet FIFA Quality Provide after care (12-month period, 6Nr visits) New full sized and small sized free standing football goals This opportunity has been distributed on adamprocure.co.uk

Scope

Reference
85DCE4D8-DBF8-46A1-BF70-1E906473ADAB
Commercial tool
Standalone contract
Contract dates
11 Aug 2025 to 29 Aug 2025
CPV classifications
50000000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
22 Jul 2025, 9:32 am

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£199k

Award date

19 Aug 2025

Contract start

11 Aug 2025

Contract end

29 Aug 2025