Design, Supply, Erection and Removal of Chipping Norton Town Centre Christmas Illuminations

Chipping Norton Town CouncilcontractContracts FinderRef CNTC/CL1/2022SME suitableclosed
View buyer

Estimated value

£39k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

17 Jun 2022

Deadline 01 Aug 2022

Description

Tenders are invited for the design, supply of, erection and removal services for Chipping Norton Town Centre Christmas Illuminations The Council's detailed requirements are defined in the specification attached. Chipping Norton Town Council are looking to procure a single suitably qualified service provider to carry out the design, supply, installation and, at the end of the season, the removal of Christmas illuminations in the town of Chipping Norton. This contract will also include overhaul of illuminations, including Council owned stock, prior to installation, as well as maintenance whilst in situ and erected. Council budget is set at £13,000 excluding VAT per annum. Council requires providers to replace mains powered LED lighting with solar powered lights where possible and where this will not lessen the impact of the display. To design, install, remove and store Christmas Lights display for 2022 to 2024 with the intent to enhance designated areas of the town. Colours for the display are to be a mixture of warm whites and cool whites. The design is to include the provision, installation, lighting and removal of 1 x 4m Christmas Tree. A switch on event may be planned to promote the display but the design should be inspirational enough to bring people into the town in its own right. The Council would also like each electrical connection used to be fitted with a functioning timer to control the lights operational timings. The Council is looking for unified display across the town. Illuminated curtain lighting on one side 1 x 4m illuminated Christmas Tree 4x1.5m illuminated Christmas Trees or Motifs/Decorations to be installed in the niches of The Town Hall Design 4 x Town Tree displays and install. Remove and retain after the festive period Test the Council's festoon lights installed on Middle Row. The Contractor shall provide sufficient resources to ensure smooth running of the switch on event, including final check of the lights before switch-on and to make sure all displays are in good working order following switch-on. The Contractor will be required to ensure all Christmas illuminations will be overhauled mechanically and electrically inspected to ensure that they are in good working order prior to installation. This applies to any of the existing Council owned illuminations that are used in the final design. Maintenance during the 6-week Festive Period: A cherry picker with contract engineer and mate will be required to ensure that all the lights are in good working order electrically and mechanically throughout the festive period. Contractor is required to provide on-call service 24 hours per day, seven days per week in order to respond to significant damage to/malfunction of illuminations outside scheduled maintenance periods, as required by Contract Administrator. A response time to site of 2 hours is required at all times.

Scope

Reference
CNTC/CL1/2022
Total value
£39,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
19 Oct 2022 to 07 Feb 2025
CPV classifications
31522000 39298900 39298910
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
01 Aug 2022, 11:00 am