Bispham To Cocker Square Coastal Protection Scheme - Call off of SCAPE Civil Engineering Framework - England, Wales and Northern Ireland
Estimated value
£61.3m
Awarded value
£61.3m
Suppliers
1
Lots
1
Published
07 Apr 2026
Description
The works comprise a pre-construction contract for the Little Bispham to Bispham & Gynn Square to Cocker Square Coast Protection Scheme (sections B1.2 & B1.4 of the Blackpool coastal frontage, respectively). The project comprises a series of Rock Headlands, with associated cross over access ramps, that are designed to stabilise or reverse the long-term beach lowering trend at the toe of the existing defences. The works also include urgent repairs to the existing coastal defences (e.g. recasting/patch repairs to selected areas such as where there is exposed reinforcement or significant cracking). This will include recasting beach access steps where required for public safety and major improvements to the slipway at Little Bispham. The extent and details of the urgent revetment repairs, recasting access steps and slipway improvements will be developed and fully defined during the detailed design phase.
Scope
- Reference
- PM2026BCBCSCPS
- Total value
- £61,264,730 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 16 Mar 2026 to 11 Jan 2030
- CPV classifications
- 45000000
Submission & procedure
- Submission deadline
- 01 Feb 2026, 5:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£61.3m
Award date
04 Feb 2026
Contract start
16 Mar 2026
Contract end
11 Jan 2030