SMARTLINE Project - Sensor Installation, Maintenance and Removal
Estimated value
£192k
Awarded value
£192k
Suppliers
1
Lots
1
Published
12 Nov 2017
Description
Scope of Work 14. This tender consists of 14.1. Becoming familiar with the installation requirements of the sensors / gateways 14.2. Arranging installation appointments following the standard Coastline Housing process described in sections above 14.3. Receiving, physically checking and managing stocks of pre-configured / labelled sensors 14.4. Installing sensors, gateways and other devices in homes 14.5. Ensuring the specified connectivity back to the Data Collection System is in place 14.6. Confirming that the sensors are communicating with the Data Collection System and data is being collected, using the system provided. 14.7. Re-visit houses during the maintenance period to maintain / replace equipment (including making the appointments with residents) in line with the Maintenance SLA requirements set out below. 14.8. De-install all equipment by the end of the project period. This may be on an 'as required' basis if home decided to withdraw from the project and/or at the end of the 2 year data collection period (see Project Timescale section) 14.9. Maintain and communicate accurate records of all contacts with residents 14.10. Maintain and communicate accurate records of all sensors, gateways and other equipment installed, maintained and de-installed. 14.11. Collate equipment de-installed and handover to the project team at the end of the project 14.12. Report on a monthly basis 14.13. Produce an end-of-project report
Scope
- Reference
- 20171112123017-53042
- Total value
- £192,115 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 07 Aug 2017 to 08 Aug 2017
- CPV classifications
- 45300000 45310000 50410000 50711000 51110000 51610000 51612000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 06 Aug 2017, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£192k
Award date
17 Aug 2017
Contract start
07 Aug 2017
Contract end
08 Aug 2017