Harwell Bldg 462 Vent I/O

CTM Portal for the NDA Shared Services AlliancecontractContracts FinderRef 20191019160033-3510SME suitableclosed

Estimated value

£180k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

19 Oct 2019

Deadline 18 Nov 2019

Description

Upgrading of Building B462 ventilation control systems to replace imminent obsolescent Sattcom I/O to include: 1) Design of solution. 2) Supply of hardware, see section below. 3) Creation of factory acceptance and commissioning tests to satisfaction of Magnox PM 4) Factory testing to satisfaction of Magnox PM 5) Supply of Method statements and Risk Assessments to satisfaction of Magnox safety department. 6) Installation of ABB S800 compatible I/O hardware to replace Sattcon I/O hardware leaving field wiring unchanged as much as possible. 7) Installation of any additional trunking, cabinets etc. as required by the solution. 8) Relocation of the PLC into a cabinet along with the I/O. 9) Update I/O addressing within PLC leaving application program unchanged. 10) Update Control Builder to latest version with associated media and licences. 11) Installation to be performed in such a way as to minimise downtime of the building ventilation system. 12) Commissioning to ensure operation of PLC is unchanged by upgrade to satisfaction of Magnox PM 13) Supply of drawings of physical and electrical installation as AutoCAD drawings on Magnox templates.

Scope

Reference
20191019160033-3510
Total value
£180,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
06 Jan 2020 to 30 Apr 2020
CPV classifications
31712113 51110000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
18 Nov 2019, 12:00 am