Green Spaces walls project
Estimated value
—
Awarded value
—
Suppliers
0
Lots
1
Published
27 Jul 2018
Description
The works comprise a series of repair works to five sites local to Stroud town centre. The sites can be broken down as follows: Site 1 rebuilding of 15m previously dismantled stone wall with concrete blockwork backing, with mortar joint and capping repairs undertaken to another approx. 130m length of boundary wall. Site 2 Repair works to a series of walls in a public park, including replacement stone, repointing, a small number of helibar reinforcements and repairs to cappings and copings. Site 3 Stone repair and DOFF cleaning to a stone-built clock tower in Stroud town centre. Site 4 Partial rebuild of a 60m retaining wall, with further localised stone repairs and capping replacement to length of wall. Site 5 Stone repairs and repointing to a 1.8m high retaining wall within a public park.
Scope
- Reference
- STC4
- Commercial tool
- Standalone contract
- CPV classifications
- 45210000 45262500 45262522
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 28 Aug 2018, 11:00 pm