9407 - Structural Repairs to External Stairs and Landings at:Orchard Street, West Pottergate & Paragon Place - Stairs Phase 4
Estimated value
£115k
Awarded value
£181k
Suppliers
1
Lots
1
Published
28 Nov 2016
Description
Maintenance and repair works are required to a range of structural defects which relate to (but may not be limited to):- Works comprises of 5 blocks of flats within similar low rise residential estates. The works involve: Repairs to external reinforced concrete access decks/landings and staircases including surface preparation, survey, break out, repair, selective use of corrosion inhibitors, surface treatment and protective coatings. In addition works include preparation, repair and over coating access deck/landings membranes and concrete staircases, renewing any movement joints in decks, removing existing painted galvanised metal railings to access decks/landings and staircases and arranging for specialist off-site treatment to remove paint, returning railings to site, reinstating and fitting new 'warm feel' handrail capping's and repairing areas of defective brickwork. Removal of existing precast concrete stairs comprising combined treads and riser units and replacing with new pre cast concrete steps fitted to existing precast concrete strings. Temporary staircases will be required to maintain access to dwellings where precast steps are being replaced.
Scope
- Reference
- NRW/HSG/9407/A/2
- Total value
- £115,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 21 Oct 2016 to 29 Jun 2017
- CPV classifications
- 45210000 45262700 71315000 71326000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 28 Sept 2016, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£181k
Award date
28 Nov 2016
Contract start
21 Oct 2016
Contract end
29 Jun 2017