Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station
Estimated value
£20.0m
Awarded value
—
Suppliers
0
Lots
1
Published
19 Apr 2023
Description
WP12.2.1 - HS2 Lift Steelwork & Glazing Scope of Work: The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope: • Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors. • Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes. • Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.
Scope
- Reference
- C4N70243081
- Total value
- £20,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Jun 2024 to 30 Mar 2028
- CPV classifications
- 42416100 45262670 45441000 45210000 45223100 39299200 45223110
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 01 May 2023, 7:00 am