Replacement of Hydraulic Oil in Benfleet, Fobbing and Easthaven Barriers

Environment AgencycontractContracts FinderRef A9UL-NV642B-A9VJ-MCXJE8SME suitablewithdrawn

Estimated value

£90k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

13 May 2016

Deadline 26 May 2016

Description

Replacement of circa 25,000 litres of hydraulic oil from the operating systems of three tidal barriers in the Thames Estuary. Ensuring minimal downtime for the barriers which are critical flood defence assets and safe disposal of the used oil. The hydraulic oil at three large flood barriers at Benfleet and Pitsea in Essex is contaminated and requires replacing. The barriers protect people and property so the oil must be replaced with the minimum of downtime, this will require close co-operation with Environment Agency staff. The total quantity of oil for each of the three barriers is estimated at 8000 litres, and will be supplied FOC by the Environment Agency. A site visit will be provided at tender stage (early-June).

Scope

Reference
A9UL-NV642B-A9VJ-MCXJE8
Total value
£90,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
20 Jun 2016 to 20 Jun 2016
CPV classifications
09211600
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
26 May 2016, 11:00 pm