Locomotive Wrap design, Removal and Re-livery of Class 68 and 88 Fleet
Estimated value
—
Awarded value
—
Suppliers
0
Lots
1
Published
12 Nov 2025
This is a preliminary market engagement notice
Map the supplier landscape and document your shortlist before opening the tender. The market simulation produces a defensible audit record you can attach to your procurement file.
Description
Locomotive Wrap Design, Removal and Re-livery of Class 68 and 88 Fleet over a three-year programme. Atamis login - https://atamis-2464.my.site.com/s/Welcome DRS is, on a voluntary basis, operating under the Procurement Act 2023 (PA23) for this procurement and is therefore advertising this opportunity on the Central Digital Platform. By doing so, it does not become a public authority and DRS reserve the right to deviate from the PA23 at its discretion but will preserve the principles of fairness and transparency.
Scope
- Reference
- ocds-h6vhtk-05dec4
- Total value
- £0 excluding VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 31 Jan 2026 to 30 Jan 2029
- Main category
- services
- CPV classifications
- 50221000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| TECH02 | Please describe how you will manage the contract from resource management and capacity planning to deliver the three-year livery programme and its requirements as detailed in Schedule 1 – Specification Document. | quality | 15.00% |
| TECH03 | Please provide a detailed three-year plan outlining the key phases of mobilisation and re-livery based on the programme schedule included in Schedule 1 – Specification Document. | quality | 15.00% |
| QA01 | Please describe the quality assurance and control measures you will implement to ensure all livery works meet the standards and specifications outlined in Schedule 1 – Specification Document. | quality | 15.00% |
| HSE01 | Please describe and evidence your Health, Safety & Enviromental management approach for this contract. | quality | 15.00% |
| CO01/CO02 | 90% Removal of existing livery, design of replacement livery, production & installation per locomotive 10% Corrosion and bodywork management cost of Operative | cost | 40.00% |