PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
176
New notices
Posted · 30d
10,890
All notice types
Awarded · 7d
1,296
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 103 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
06 Nov
—
Estimated
Modification
FTS
WY
West Yorkshire Combined Authority
Investment Readiness Programme
· Published 06 Nov
CLOSED
05 Dec
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1860-T-TH Cycle Hire Scheme
Transport equipment· Published 06 Nov
CLOSED
14 Nov
£20.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and Machinery
Industrial machinery· Published 06 Nov
CLOSED
05 Nov
—
Estimated
Modification
FTS
SB
Slough Borough Council
Accommodation based Housing Related Support Service for Lot 1 (Medium to High Needs) and Lot 2 (Low to Medium Needs)
· Published 05 Nov
CLOSED
26 Nov
£29k
Estimated
Closed
CF
PS
Professional Standards Authority for Health And Social Care
Parliamentary monitoring
R&D services· Published 05 Nov
CLOSED
28 Nov
£50k
Estimated
Closed
CF
LB
London Borough of Barnet (LBB)
GB-Barnet: The Postcard Project
Recreational & cultural· Published 05 Nov
CLOSED
08 Dec
£750k
Estimated
Closed
CF
BP
BSOL Procurement Collaborative
Crisis Housing PROC.90.0023 - Tender
Health & social· Published 05 Nov
CLOSED
05 Nov
—
Estimated
Modification
FTS
NI
Northern Ireland Housing Executive
Provision of a Skip Hire Service for Derry and Strabane
· Published 05 Nov
CLOSED
12 Nov
£250k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Heathrow Airport - ATC Tower - Glazing
Construction work· Published 05 Nov
CLOSED
05 Nov
—
Estimated
Modification
FTS
NI
Northern Ireland Housing Executive
Supply and Delivery of a Turnkey Modular Classroom
· Published 05 Nov
CLOSED
12 Nov
£500k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Heathrow Airport - ATC Tower - Façade Repairs / External Metals
Construction work· Published 05 Nov
CLOSED
26 Nov
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Water Tanker Truck for Technical Water
Transport equipment· Published 05 Nov
CLOSED
10 Dec
£3
Estimated
Closed
CF
CI
Chemonics International, Inc.
Routine repair of sanitary facilities on the ground floor of Lyceum No. 3, located at: 22 Shevchenko Street, Okhtyrka, Sumy
Construction work· Published 05 Nov
CLOSED
19 Nov
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Advanced Works Concrete
Construction materials· Published 05 Nov
CLOSED
05 Nov
—
Estimated
Closed
FTS · Works
AC
Aberdeen City Council
External & Communal Pre Construction Services and Works to Houses Framework  CRN00039877
Construction materials· Published 05 Nov
CLOSED
12 Nov
£1.0m
Estimated
Closed
CF
SJ
SCS JV
WP075.5_HRB Bearings
Construction work· Published 05 Nov
CLOSED
12 Nov
£1.3m
Estimated
Closed
CF
VD
VIVO DEFENCE SERVICES LIMITED
Ruislip Door and Window Replacement
Construction work· Published 05 Nov
CLOSED
14 Nov
£1.3m
Estimated
Closed
CF
MU
Manchester University NHS Foundation Trust
Insourcing Arrangement for Elective Care - Complex Gynaecology
Health & social· Published 05 Nov
CLOSED
05 Nov
£348k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Internal Refurbishment of single large property at Palace Barracks - FY2025/26 - Amey North Region - Northern Ireland
Construction work· Published 05 Nov
CLOSED
18 Dec
£200k
Estimated
Closed
CF
WF
Wyre Forest District Council on Behalf of WFDC / RBC / BDC
Food Waste Collection Service
Sewage & refuse· Published 05 Nov
Page 103 of 8261
PreviousNext