PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
293
New notices
Posted · 30d
11,963
All notice types
Awarded · 7d
1,490
Market signal

Notice peek

×
MO
ClosedCF · 6f6b4f7c63b6

Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
17 Dec 2025

Key facts

Notice ID
cf-5f0492c6-18f0-42bb-900b-6f6b4f7c63b6
CPV code
44114250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    17 Dec 2025

Description

Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) The basic requirement under Work Order WC1858011 focuses on repairing existing assets to extend their service life. - Clear vegetation at the area where the concrete bases are to be repaired in accordance with the directions provided by relevant stakeholders following relevant assessment and as below. Vegetation to be removed must be kept to the absolute minimum. - Contractor carrying out the works to liaise with Mitie QSHE Team prior to commencement of any works to assess the area. - Take out the existing electric cables located on existing steel feeder tray. - Place cables elsewhere to a safe location to avoid any damages during the reinstatement works. - Take down existing steel feeder tray (if any) and dispose waste material to license dipping site. - Install heavy duty hot dip galvanized cable tray with 260mm height and 1.2mm thickness to existing steel pole of feeder pole. Cable tray to be secured on steel pole using adjustable U-bolt bracket. Re-install associated cables with appropriate fixings (not plastic ty-wraps). - Excavate around feeder pole with hand digging. The depth of excavation shall be 600mm below ground level. Excavation to be kept to the absolute minimum required. - Clean the exposed concrete pole surface using rotary machine. - Apply cement based elastomeric waterproof coating to all exposed concrete surfaces of the existing feeder pole. - At the completion of cement elastomeric application, backfill and compact the excavate area with excavated soil material. Any excessive soil shall be delivered on licensed facilities for management. - Clean existing steel pole using power tools to grade of cleaning St 3 (Very thorough hand and power tools). The repairs need to be done according to the Grade of each asset: Grade 3 (Critical): Urgent local repairs - patching or jacketing of bases, reinforcement cleaning, bolt and tray replacements, and heavy recoating of steelwork. Grade 2 (Moderate): Selective repairs - concrete patching, localized steel plate strengthening, protective epoxy coatings, and timber preservative treatments. Grade 1 (Good): Preventive maintenance - cleaning, sealing, and protective surface treatments. The aim is to stabilize defects, slow deterioration, and preserve as much original structure as possible. The Provisional Key Tender dates for the project are as follows: - Expression of interest: Tuesday 16/12/2025 - Expression of interest return: Tuesday 23/12/2025 - Invitation to Tender: Thursday 08/01/2026 - Tender Return Date: Monday 09/02/2026 - Contract award: Friday 16/03/2026 - Commencement of work: Monday 31/08/2026 - Completion of work: Friday 25/09/2026 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces).

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 113 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
11 Nov
£10k
Estimated
Closed
CF
NE
North East Lincolnshire Borough Council
Heritage Place Development & Growth Programme NEL
Business services· Published 17 Oct
CLOSED
23 Oct
£150k
Estimated
Closed
CF
WS
West Sussex County Council
Ryebank - Klargester Replacement
Construction work· Published 17 Oct
CLOSED
18 Dec
£2.5m
Estimated
Closed
CF
FS
Fujitsu Services UK Ltd
SME Opportunity - Fibre & Copper Installation at Heathrow (Fujitsu)
Architecture & engineering· Published 17 Oct
CLOSED
31 Oct
£250.0m
Estimated
Closed
CF
SC
Sizewell C Limited
SZC - Main Works Earthworks - Bulk Excavation
Construction work· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Communal Heating Installation Works
· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Delivery Warm Homes
· Published 17 Oct
CLOSED
05 Dec
—
Estimated
Closed
CF
TP
The Portico Academy Trust
CA16616 - Portico Academy Trust _ Essex
Sewage & refuse· Published 17 Oct
CLOSED
17 Nov
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1842-T-TS Fire Safety Services
Electrical machinery· Published 17 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
UO
University of Bristol
Archive Collections Management System
Software packages· Published 16 Oct
CLOSED
27 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Noise Barrier Piles
Transport equipment· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
NR
Network Rail Infrastructure Ltd
W&W Earthworks Examinations CP7 Year 2
· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
CO
City of York Council
Planned Maintenance of Fire Systems and Emergency Lighting
· Published 16 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
DF
Department for Education
Tackling Antisemitism in Education Innovation Fund - Market Engagement Event
Education & training· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
FTS · Services
ST
ScotRail Trains Ltd
SR-PACT-PROJ-216 HST Power Car Remote Monitoring System
Repair & maintenance· Published 16 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA354085 - Concrete Platform Slab Repair
Construction work· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: BLD0277-02 24 Store Roof Remedials
Construction work· Published 16 Oct
CLOSED
20 Nov
£5.0m
Estimated
Closed
CF
TU
THE UNIVERSITY OF WESTMINSTER
Estates - General Consultancy Support
Architecture & engineering· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
US
UK SPACE AGENCY
UKSAC25_0071 - Threat Led Penetration Testing - Black Team
· Published 16 Oct
CLOSED
22 Oct
£250k
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6101 - Water Treatment for LTHW and CHW Closed Loop Systems - Intrusive surveys (Terminal 2)
Construction work· Published 16 Oct
CLOSED
22 Oct
£1.0m
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6102 - Water Treatment for Cooling Towers - intrusive survey & design (All Terminals)
Construction work· Published 16 Oct
Page 113 of 8261
PreviousNext