PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
176
New notices
Posted · 30d
10,050
All notice types
Awarded · 7d
1,202
Market signal

Notice peek

×
BG
ClosedCF · 3fc263e309cb

Asset wide BMS Upgrade in Diplomatic Mission

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
22 Apr 2025

Key facts

Notice ID
cf-1ed82c07-c877-48cf-855c-3fc263e309cb
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    22 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 12 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
06 May
—
Estimated
Modification
FTS
UI
UK Industrial Fusion Solutions Ltd
Procurement of 316L(N)-IG Austenitic Stainless-Steel plates
· Published 06 May
CLOSED
06 May
—
Estimated
Modification
FTS
LB
London Borough of Hammersmith and Fuham
Managed Services for Temporary Agency Staff 2026
· Published 06 May
CLOSED
06 May
—
Estimated
Modification
FTS
BH
Brighton & Hove City Council
Hard Surfaces Weed Management 2026
· Published 06 May
CLOSED
05 May
—
Estimated
Modification
FTS
LA
LEIGH ACADEMIES TRUST
Leigh Academies Trust - Mobile Device Scheme
· Published 05 May
CLOSED
05 May
—
Estimated
Modification
FTS
FT
FIRST TRENITALIA WEST COAST RAIL LIMITED
Estate Management
· Published 05 May
CLOSED
05 May
—
Estimated
Modification
FTS
SL
Student Loans Company
Data Solution Delivery Partner
· Published 05 May
CLOSED
01 May
—
Estimated
Modification
FTS
RB
Royal Borough of Greenwich
NextGen Youth
· Published 01 May
CLOSED
01 May
—
Estimated
Modification
FTS
SB
Swindon Borough Council
Removal and installation of current and new street light columns and associated groundworks and electrical connections and disconnections, yearly clean and electrical testing, night patrol and Ad-Hoc repairs.
· Published 01 May
CLOSED
01 May
—
Estimated
Modification
FTS
WA
Warrington and Halton Teaching Hospitals NHS Foundation Trust
Hotel Venue for Finance Directors Conference
· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
NW
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)
Dental Services - Carmarthen
Health & social· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
NW
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)
Dental Services - Pembrokeshire
Health & social· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
NW
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)
Dental Services - Ceredigion
Health & social· Published 01 May
CLOSED
01 May
—
Estimated
Modification
FTS
PC
PLYMOUTH COMMUNITY HOMES LIMITED
Commercial Portfolio
· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Works
TC
The City of Edinburgh Council
Former Castlebrae High School Residential Scheme
Construction work· Published 01 May
CLOSED
08 May
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: WC1680030 - CY-AYN-CISP Tool: 124359-F/U PPM Remedial - Replacement of Chiller- Works WC1831796 - CY-DHK-CIDP Tool Ref: 124360- FY26/27-F/U PPM Remedial - Replacement of Chiller- Works
Industrial machinery· Published 01 May
CLOSED
30 Apr
—
Estimated
Modification
FTS
KC
Kent County Council
Highways Urban Grass, Shrubs & Hedges Maintenance
· Published 30 Apr
CLOSED
30 Apr
—
Estimated
Modification
FTS
DE
Defence Equipment and Support
714964450 - Engineering Delivery Partner (EDP) Future Contract - PD1 - Pipeline Notice (UK 1)
· Published 30 Apr
CLOSED
30 Apr
—
Estimated
Modification
FTS
SB
Stevenage Borough Council
SBC 0126 Provision of Property Management Services and Business Support Services at the Business Technology Centre (BTC) and Chells Industrial Units (CIU)
· Published 30 Apr
CLOSED
30 Mar
£235k
Estimated
Closed
CF
RB
Royal Borough of Kingston Upon Thames
Wide Area Network (WAN) Services
Radio & TV equipment· Published 30 Apr
CLOSED
07 Jun
—
Estimated
Closed
CF
SC
Shropshire Council
North West Relief Road Project
Construction work· Published 30 Apr
Page 12 of 8261
PreviousNext