PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
324
New notices
Posted · 30d
12,356
All notice types
Awarded · 7d
1,564
Market signal

Notice peek

×
MO
ClosedCF · 6f6b4f7c63b6

Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
17 Dec 2025

Key facts

Notice ID
cf-5f0492c6-18f0-42bb-900b-6f6b4f7c63b6
CPV code
44114250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    17 Dec 2025

Description

Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) The basic requirement under Work Order WC1858011 focuses on repairing existing assets to extend their service life. - Clear vegetation at the area where the concrete bases are to be repaired in accordance with the directions provided by relevant stakeholders following relevant assessment and as below. Vegetation to be removed must be kept to the absolute minimum. - Contractor carrying out the works to liaise with Mitie QSHE Team prior to commencement of any works to assess the area. - Take out the existing electric cables located on existing steel feeder tray. - Place cables elsewhere to a safe location to avoid any damages during the reinstatement works. - Take down existing steel feeder tray (if any) and dispose waste material to license dipping site. - Install heavy duty hot dip galvanized cable tray with 260mm height and 1.2mm thickness to existing steel pole of feeder pole. Cable tray to be secured on steel pole using adjustable U-bolt bracket. Re-install associated cables with appropriate fixings (not plastic ty-wraps). - Excavate around feeder pole with hand digging. The depth of excavation shall be 600mm below ground level. Excavation to be kept to the absolute minimum required. - Clean the exposed concrete pole surface using rotary machine. - Apply cement based elastomeric waterproof coating to all exposed concrete surfaces of the existing feeder pole. - At the completion of cement elastomeric application, backfill and compact the excavate area with excavated soil material. Any excessive soil shall be delivered on licensed facilities for management. - Clean existing steel pole using power tools to grade of cleaning St 3 (Very thorough hand and power tools). The repairs need to be done according to the Grade of each asset: Grade 3 (Critical): Urgent local repairs - patching or jacketing of bases, reinforcement cleaning, bolt and tray replacements, and heavy recoating of steelwork. Grade 2 (Moderate): Selective repairs - concrete patching, localized steel plate strengthening, protective epoxy coatings, and timber preservative treatments. Grade 1 (Good): Preventive maintenance - cleaning, sealing, and protective surface treatments. The aim is to stabilize defects, slow deterioration, and preserve as much original structure as possible. The Provisional Key Tender dates for the project are as follows: - Expression of interest: Tuesday 16/12/2025 - Expression of interest return: Tuesday 23/12/2025 - Invitation to Tender: Thursday 08/01/2026 - Tender Return Date: Monday 09/02/2026 - Contract award: Friday 16/03/2026 - Commencement of work: Monday 31/08/2026 - Completion of work: Friday 25/09/2026 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces).

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 12 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
28 Apr
—
Estimated
Modification
FTS
LS
LOCAL SPACE
Insurance Services
· Published 28 Apr
CLOSED
08 May
—
Estimated
Closed
CF
WS
West Suffolk NHS Foundation Trust
CA17712 - Paediatric autism assessment capacity
Health & social· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
DM
Dudley Metropolitan Borough Council
Servicing, Maintenance and Repair of Domestic & Commercial Heating Systems
· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
DM
Dudley Metropolitan Borough Council
Electrical Inspection, Repairs and Installations Contract
· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
NC
Nottingham City Council
CPU 6172 Supply and Delivery of Frozen & refrigerated Food, Groceries and Fresh Meat
· Published 28 Apr
CLOSED
07 May
—
Estimated
Closed
CF
WB
WINKLE - BOTTOM LTD
External redecorations and associated external and internal repairs
Repair & maintenance· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
GP
Great Places Housing Group Limited
Retrofit Installers
· Published 28 Apr
CLOSED
08 May
£100k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Plumley: OPA/T823 - Wireline Services
Oil & gas services· Published 28 Apr
CLOSED
05 May
£5.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Highways Works - NC2A draft
Construction work· Published 28 Apr
CLOSED
05 May
£5.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Highways Works - NC2A
Construction work· Published 28 Apr
CLOSED
08 May
£100k
Estimated
Closed
CF
LM
London Museum
GB-London: Commercial Events and Programme Production Partner
Business services· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
TT
Trowbridge Town Council
Fire Alarms, Intruder Alarms & Access Control Testing, Maintenance and Monitoring.
· Published 28 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
UH
University Hospitals Plymouth
PPSA - Pharmacy Logistics Service
· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Closed
FTS · Services
SG
Scottish Government
Maintenance & Repair of Vessel Propulsion Drives
Repair & maintenance· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
WA
Westmorland and Furness Council
Repair Works at Thorncliffe Cemetery Gatehouse and Former Roman Catholic Chapel, Barrow in Furness
· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
CB
Chesterfield Borough Council
Thorntree Court Roof Replacement
· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
UU
UNITED UTILITIES WATER LIMITED
PRO004920-Services-Framework-Mechanical Services
· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
NC
Newport City Council
NCC202500260 - Chartist Drive Construction Phase Strengthening and Upgrade
· Published 27 Apr
CLOSED
27 Apr
—
Estimated
Modification
FTS
PA
Procurement and Logistics Service, Business Services Organisation
Total Bed Management
· Published 27 Apr
CLOSED
15 Oct
£337k
Estimated
Closed
CF
TC
The Christie NHS Foundation Trust
Outline Business Case - EPR
IT services· Published 27 Apr
Page 12 of 8261
PreviousNext