PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
204
New notices
Posted · 30d
7,771
All notice types
Awarded · 7d
999
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 126 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
17 Oct
£50k
Estimated
Closed
CF
CC
Cambridgeshire County Council
Swansley Lane Cycle Track (U63) - JPSF Further Competition
Architecture & engineering· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: BLD0127-50 NAS Roof, Plant Room Replacement
Construction work· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Modification
FTS
PC
Plymouth City Council
Plymouth Domestic Abuse Service and Behaviour Change
· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Modification
FTS
MO
Ministry of Defence, DIO,
Provision of Salvaged Aircraft Hulls and Facilities
· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Modification
FTS
CP
CRESCENT PURCHASING LIMITED
Invitation to Tender (ITT) - Construction & Capital Works
· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Modification
FTS
MO
Ministry of Defence, DIO,
For the Supply of Salvaged Aircraft Doors and Cockpit Glass
· Published 03 Oct
CLOSED
26 Apr
—
Estimated
Closed
CF
DD
DfTc - Department for Transport
Provision of Active Travel Portfolio Research and Evaluation Programme 2022+
R&D services· Published 03 Oct
CLOSED
30 Dec
—
Estimated
Closed
CF
PG
PEOPLEPLUS GROUP LIMITED
PeoplePlus Prison Education Service Core Education Sub-Contractor
Administration services· Published 03 Oct
CLOSED
09 Oct
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree works operations
Repair & maintenance· Published 03 Oct
CLOSED
09 Oct
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree works operations
Repair & maintenance· Published 03 Oct
CLOSED
17 Oct
—
Estimated
Closed
CF
HC
Halesowen College
CA16542 - Halesowen College - Quantity Surveyor Services
Architecture & engineering· Published 03 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
FS
FCDO Services
FAS/EM Lighting Faults - 23/24, Tel Aviv, Israel
Construction work· Published 03 Oct
CLOSED
03 Jan
—
Estimated
Closed
CF
CC
Cornwall Council
Support for Care Experienced Young People
Administration services· Published 03 Oct
CLOSED
17 Oct
—
Estimated
Closed
CF
HC
Halesowen College
CA16547 - Halesowen College M&E Consultancy Services
Architecture & engineering· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Closed
FTS · Services
DA
Dumfries and Galloway Health Board
NHSDG Estates & Property Lightning Protection Service & Maintenance
· Published 03 Oct
CLOSED
05 Dec
£25k
Estimated
Closed
CF
ET
ELLESMERE TOWN COUNCIL
Christmas Lights and Decorations
Electrical machinery· Published 03 Oct
CLOSED
17 Oct
—
Estimated
Closed
CF
HC
Halesowen College
CA16546 - Halesowen College - Appointment of a Structural Engineering Contractor
Architecture & engineering· Published 03 Oct
CLOSED
03 Oct
—
Estimated
Modification
FTS
TC
Telford College
Catering Services PQQ
· Published 03 Oct
CLOSED
13 Nov
£500k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Gosport: OPA T803 Gosport Depot EICR
Construction work· Published 02 Oct
CLOSED
16 Oct
£90k
Estimated
Closed
CF
KC
Kings College Hospital
Building Fabric (Orpington Hospital)
Construction work· Published 02 Oct
Page 126 of 8261
PreviousNext