PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
234
New notices
Posted · 30d
10,962
All notice types
Awarded · 7d
1,329
Market signal

Notice peek

×
MO
ClosedCF · b1f3cf975927

SUPPLY CHAIN NOTICE - Central Substation RIBA4 & Build

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
19 Mar 2026

Key facts

Notice ID
cf-550e2499-b437-4f0b-8773-b1f3cf975927
CPV code
45232220 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    19 Mar 2026

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: - WP 1: Survey and assessment work to facilitate the RIBA 4 design. - WP 2: RIBA 4 Technical Design incl. all temporary works designs. - WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: - WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete. Those that meet the criteria of this initial phase will be invited to participate in a final competition. Deadlines for expressions of interest are the 27th March. Any expressions received after this date will not be accepted.

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 129 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
03 Oct
—
Estimated
Closed
CF
FE
FEDCAP EMPLOYMENT LIMITED
The Supply of IPS/SEQF and Health and Community Integration Services under Connect to Work in Berkshire and Hampshire
Education & training· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
SM
Solihull Metropolitan Borough Council
SOL - Licensing Supplies for Plates and Badges 2025
· Published 25 Sept
CLOSED
10 Oct
£50k
Estimated
Closed
CF
NM
National Maritime Museum (NMM)
GB-London: PPMCC - Security Gates
Construction materials· Published 25 Sept
CLOSED
09 Oct
—
Estimated
Closed
CF
DC
DIGITAE CONSULTANCY SERVICES LTD
Medical Consumables and Breathalysers.
Clothing & footwear· Published 25 Sept
CLOSED
08 Oct
£500k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Matter Management solution
IT services· Published 25 Sept
CLOSED
25 Sept
£900k
Estimated
Closed
CF
CI
Chemonics International, Inc.
Expression of Interest/ Global South Strategic Communications Campaign
Business services· Published 25 Sept
CLOSED
26 Oct
—
Estimated
Closed
CF
NC
North Cumbria Integrated Care NHS Foundation Trust
NCIC - Milk & Bread
Food & beverages· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
HF
HERTS FOR LEARNING LIMITED
HFL Education - Management Information Systems - Open Framework
· Published 25 Sept
CLOSED
09 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P8 Fans and Associated Equipment - Costain HRS02 Tunnel and Lineside M&E
Furniture & furnishings· Published 25 Sept
CLOSED
09 Oct
£5.0m
Estimated
Closed
CF
CG
Costain Group PLC
P5 Lighting and Lighting Controls - HRS02 Tunnel and Lineside M&E
Electrical machinery· Published 25 Sept
CLOSED
09 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E
Electrical machinery· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
UI
UK Industrial Fusion Solutions Ltd
Detailed Design and Build of a Compound Cryogenic Pump Prototype (CCPP)
· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
AH
ateb Housing Group Ltd
ateb Renew Framework
· Published 25 Sept
CLOSED
25 Mar
£5.0m
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
UK Defence Training Estate Projects
Construction work· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
IO
Isle of Wight Council
Public Realm Works - East Cowes, Isle of Wight
· Published 25 Sept
CLOSED
12 Sept
£815k
Estimated
Closed
CF
HO
Home Office
DBS Occupational Health Services
Health & social· Published 25 Sept
CLOSED
23 Oct
—
Estimated
Closed
CF
UO
University of Bristol
Purchase of IR Detectors for School of Chemistry
Laboratory equipment· Published 25 Sept
CLOSED
22 Oct
—
Estimated
Closed
CF
NE
North East Ambulance Service
Consultancy opportunity - Estates advisory service for NEAS
Architecture & engineering· Published 25 Sept
CLOSED
17 Oct
£150k
Estimated
Closed
CF
PT
Padstow Town Council
Padstow South Dock Works
Construction work· Published 24 Sept
CLOSED
22 Oct
£1.4m
Estimated
Closed
CF
TW
Tyne & Wear Building Preservation Trust
The Tyre Shop Sunderland
Construction work· Published 24 Sept
Page 129 of 8261
PreviousNext