PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
314
New notices
Posted · 30d
12,106
All notice types
Awarded · 7d
1,520
Market signal

Notice peek

×
KI
ClosedCF · c8679e0531ff

Brewery Turnback - ES6-8 Civil Engineering

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£1.0m
Published
07 Oct 2025

Key facts

Notice ID
cf-9f791490-ed70-4330-8333-c8679e0531ff
CPV code
45200000 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Oct 2025

Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Ancillary Civil Engineering Scope of Work: The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 138 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
09 Sept
—
Estimated
Modification
FTS
SD
South Derbyshire District Council
Rosliston Forestry Centre Doors and Glazing
· Published 09 Sept
CLOSED
07 Oct
—
Estimated
Closed
CF
HO
Home Office
Invitations of Applications - PAVA spray testing for Home Office Certification
Architecture & engineering· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Muck Away Haulage
Construction work· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Demolition Services M3J9
Construction work· Published 09 Sept
CLOSED
30 May
—
Estimated
Closed
CF
NH
National Highways
ITEP0979 - Adobe renewal
Software packages· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
M3J9 Sprayed Concrete
Construction materials· Published 09 Sept
CLOSED
21 Aug
—
Estimated
Closed
CF
EA
Environment Agency
Salford Basin Footpath - NW DA 25/26
Construction work· Published 09 Sept
CLOSED
03 Oct
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Provision of broker services and medical insurance for the British High Commission in Port of Spain, Trinidad & Tobago
Financial services· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
LS
LONDON SOUTH BANK UNIVERSITY
Adult Skills Fund - Subcontractors and Partners
· Published 08 Sept
CLOSED
14 Dec
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
One Vision Housing - Asset Management Tender
Construction work· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
ND
North Devon District Council
Green Lanes Roofing Repairs Works
· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
TR
Two Rivers Housing
Fleet Replacement - Two Rivers Housing: ID612
· Published 08 Sept
CLOSED
03 Oct
£5.0m
Estimated
Closed
CF
PV
PAILTON VILLAGE CIC
GB-Pailton: White Lion Pailton Main Contractor Conservation and Repair Works Pre Qualification Questionnaire
Construction work· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
T
Translink
P-3244 Insurance Claims Management System
· Published 08 Sept
CLOSED
16 Sept
—
Estimated
Closed
CF
BG
blueTree Group B.V.
Invitation to Bid FOR PRINTING, PACKING, AND DELIVERY OF PUPILS BOOKS And TEACHER GUIDES
Education & training· Published 08 Sept
CLOSED
10 Oct
—
Estimated
Closed
CF
TC
The Corporate Officer of the House of Lords and The Corporate Officer of the House of Commons
Porterage, Removals and Storage Services Market Engagement 1
Supporting transport· Published 08 Sept
CLOSED
25 Sept
£50k
Estimated
Closed
CF
PR
Pool Re Services Limited
GB-London: Microsoft Licensing Agreement
IT services· Published 08 Sept
CLOSED
03 Oct
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4828.EFM.SW.25 Alfred Denny Cladding Repairs Alfred Denny Cladding Repairs
Construction work· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Closed
FTS · Services
HC
Hertfordshire County Council
HCC - 12/24 - The Provision of Hertfordshire Public Rights of Way Vegetation Management 2025-2029
Agriculture & forestry· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
TM
TAMESIDE METROPOLITAN BOROUGH COUNCIL
LAND REMEDIATION ASHTON UNDER LYNE FORMER BUS STATION SITE
· Published 08 Sept
Page 138 of 8261
PreviousNext