PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
239
New notices
Posted · 30d
8,566
All notice types
Awarded · 7d
1,095
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 160 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
04 Aug
—
Estimated
Closed
CF
HE
Homes England (the name adopted by the Homes and Communities Agency)
Homes England - Development and Regeneration Technical Services Framework 2023-2027 - Andover
Architecture & engineering· Published 04 Aug
CLOSED
18 Aug
—
Estimated
Closed
CF
KC
Kirklees College
CA16288 - Kirklees College - Window Cleaning ITT
Sewage & refuse· Published 04 Aug
CLOSED
18 Aug
—
Estimated
Closed
CF
LB
London Borough of Hounslow
Consultancy Support - Options Appraisal for Enforcement Review
Supporting transport· Published 04 Aug
CLOSED
25 Aug
£9
Estimated
Closed
CF
CI
Chemonics International, Inc.
Major Repair of Stormwater Drainage Facility No. 1 on Kozatska Street, Novhorod-Siverskyi City, Chernihiv Oblast
Construction work· Published 04 Aug
CLOSED
05 Sept
—
Estimated
Closed
CF
CC
Chichester College Group
CA16289 - Resurfacing of the Existing Artificial Hockey Pitch
Construction work· Published 04 Aug
CLOSED
08 Sept
£50k
Estimated
Closed
CF
WF
Wyre Forest District Council
Temporary Accommodation - Preferred Supplier List - Round 2
Hotel & restaurant· Published 04 Aug
CLOSED
28 Aug
£1.0m
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Provision of White Goods
Furniture & furnishings· Published 04 Aug
CLOSED
01 Sept
£500k
Estimated
Closed
CF
CC
Colchester City Council
GB-Colchester: 0453 - PA - Voids Clearance Works
Construction work· Published 04 Aug
CLOSED
04 Aug
—
Estimated
Modification
FTS
IB
Ipswich Borough Council
Chapel Repairs Ipswich Old Cemetery
· Published 04 Aug
CLOSED
01 Aug
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: UHAF Power Generation Replacement incl. Building Construction
Industrial machinery· Published 01 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
SC
Somerset Council
External works will include roof replacement to the Manor House and adjoining flat roof, replacement glazing to dining area and link to Manor House. Future proofing of site will be implemented with an upgrade to supply and replacement of obsolete distribution board onsite. \n \n The Contractor is to refer to the Schedule of Works, Specifications and Tender Drawings for a full understanding of the works.
Construction work· Published 01 Aug
CLOSED
01 Aug
—
Estimated
Modification
FTS
LB
London Borough of Waltham Forest
Provision of Supported Housing for Single Homeless Adults
· Published 01 Aug
CLOSED
12 Aug
£340k
Estimated
Closed
CF
HC
Herefordshire Council
Meet the Buyer / Market Engagement Event for Stop Smoking Services In Herefordshire (August 2025)
Health & social· Published 01 Aug
CLOSED
29 Aug
£50k
Estimated
Closed
CF
HC
Hull City Council
Modular Building Procurement and Installation Works, 125 Wingfield Road, Hull, HU9 4QE
Construction work· Published 01 Aug
CLOSED
08 Jan
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Vehicle Recovery
Repair & maintenance· Published 01 Aug
CLOSED
15 Aug
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Temporary Closed Circuit Television (CCTV)
Radio & TV equipment· Published 01 Aug
CLOSED
15 Aug
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Temporary Average Speed Cameras at Roadworks (TASCAR)
Transport equipment· Published 01 Aug
CLOSED
15 Aug
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Journey Time Reliability (JTR) & Portable Viable Message Signs (PVMS)
Transport equipment· Published 01 Aug
CLOSED
15 Aug
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Temporary Vehicle Restraint System (TVRS)
Transport equipment· Published 01 Aug
CLOSED
22 Aug
£1.7m
Estimated
Closed
CF
SB
Swindon Borough Council
Discharge to Assess Nursing Block Contract
Health & social· Published 01 Aug
Page 160 of 8261
PreviousNext