PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
196
New notices
Posted · 30d
9,674
All notice types
Awarded · 7d
1,173
Market signal

Notice peek

×
MO
ClosedCF · 6f6b4f7c63b6

Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
17 Dec 2025

Key facts

Notice ID
cf-5f0492c6-18f0-42bb-900b-6f6b4f7c63b6
CPV code
44114250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    17 Dec 2025

Description

Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) The basic requirement under Work Order WC1858011 focuses on repairing existing assets to extend their service life. - Clear vegetation at the area where the concrete bases are to be repaired in accordance with the directions provided by relevant stakeholders following relevant assessment and as below. Vegetation to be removed must be kept to the absolute minimum. - Contractor carrying out the works to liaise with Mitie QSHE Team prior to commencement of any works to assess the area. - Take out the existing electric cables located on existing steel feeder tray. - Place cables elsewhere to a safe location to avoid any damages during the reinstatement works. - Take down existing steel feeder tray (if any) and dispose waste material to license dipping site. - Install heavy duty hot dip galvanized cable tray with 260mm height and 1.2mm thickness to existing steel pole of feeder pole. Cable tray to be secured on steel pole using adjustable U-bolt bracket. Re-install associated cables with appropriate fixings (not plastic ty-wraps). - Excavate around feeder pole with hand digging. The depth of excavation shall be 600mm below ground level. Excavation to be kept to the absolute minimum required. - Clean the exposed concrete pole surface using rotary machine. - Apply cement based elastomeric waterproof coating to all exposed concrete surfaces of the existing feeder pole. - At the completion of cement elastomeric application, backfill and compact the excavate area with excavated soil material. Any excessive soil shall be delivered on licensed facilities for management. - Clean existing steel pole using power tools to grade of cleaning St 3 (Very thorough hand and power tools). The repairs need to be done according to the Grade of each asset: Grade 3 (Critical): Urgent local repairs - patching or jacketing of bases, reinforcement cleaning, bolt and tray replacements, and heavy recoating of steelwork. Grade 2 (Moderate): Selective repairs - concrete patching, localized steel plate strengthening, protective epoxy coatings, and timber preservative treatments. Grade 1 (Good): Preventive maintenance - cleaning, sealing, and protective surface treatments. The aim is to stabilize defects, slow deterioration, and preserve as much original structure as possible. The Provisional Key Tender dates for the project are as follows: - Expression of interest: Tuesday 16/12/2025 - Expression of interest return: Tuesday 23/12/2025 - Invitation to Tender: Thursday 08/01/2026 - Tender Return Date: Monday 09/02/2026 - Contract award: Friday 16/03/2026 - Commencement of work: Monday 31/08/2026 - Completion of work: Friday 25/09/2026 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces).

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 171 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
31 Jul
£3.0m
Estimated
Closed
CF
VD
VIVO DEFENCE SERVICES LIMITED
Chivenor Door & Window Replacement
Construction work· Published 17 Jul
CLOSED
17 Jul
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: Grade 2 Listed Historic Building Full Electrical Rewire - Design and Build
Construction work· Published 17 Jul
CLOSED
17 Jul
—
Estimated
Modification
FTS
NA
NUNEATON AND BEDWORTH COMMUNITY ENTERPRISES LIMITED
NBBC - Major Voids
· Published 17 Jul
CLOSED
01 Aug
£1.3m
Estimated
Closed
CF
UO
University of Sussex
US_24012_Sciences_ Quantum Space Expansion
Agricultural products· Published 17 Jul
CLOSED
11 Sept
—
Estimated
Closed
CF
SA
SATELLITE APPLICATIONS CATAPULT LIMITED
Audio Visual Requirement
IT services· Published 17 Jul
CLOSED
17 Jul
—
Estimated
Modification
FTS
FA
FORWARD AS ONE CHURCH OF ENGLAND MULTI ACADEMY TRUST
PP-10150 Forward as One CofE MAT Catering
· Published 17 Jul
CLOSED
17 Jul
—
Estimated
Modification
FTS
LD
Lichfield District Council
Garden Waste Stickers
· Published 17 Jul
CLOSED
07 Aug
£50k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
GB-London: Market research into the data landscape within English local government
R&D services· Published 17 Jul
CLOSED
17 Jul
£54k
Estimated
Closed
CF
BC
Blackpool Council
37 Erdington Road
Construction work· Published 17 Jul
CLOSED
27 Aug
—
Estimated
Closed
CF
GP
GREENWOOD PROJECTS LIMITED
Audio, Video and Performance Lighting Systems - Link Project, Ashbourne Methodist Church
Radio & TV equipment· Published 17 Jul
CLOSED
08 Aug
—
Estimated
Closed
CF
CT
Chippenham Town Council CEO
INVITATION TO TENDER FOR 2 1580 TERRAINCUT™ COMMERCIAL FRONT MOWER (STAGE V)
CPV 16· Published 16 Jul
CLOSED
26 Aug
£50k
Estimated
Closed
CF
MW
Merseyside Waste Disposal Authority
LCR PRIMARY SCHOOL WASTE EDUCATION PROJECT
Education & training· Published 16 Jul
CLOSED
26 Aug
£50k
Estimated
Closed
CF
MW
Merseyside Waste Disposal Authority
LCR SECONDARY SCHOOL CIRCULAR ECONOMY EDUCATION PROJECT
Education & training· Published 16 Jul
CLOSED
27 Aug
—
Estimated
Closed
CF
CH
COOPER & HALL LTD
Redevelopment of Turnbridge Mill, Huddersfield - Enabling Works
Construction work· Published 16 Jul
CLOSED
16 Jul
—
Estimated
Modification
FTS
BU
BOURNEMOUTH UNIVERSITY
Bournemouth University Contract for Cleaning Services For University Estate
· Published 16 Jul
CLOSED
16 Jul
—
Estimated
Modification
FTS
PC
Peterborough City Council
Target Hardening - Peterborough
· Published 16 Jul
CLOSED
29 Jul
—
Estimated
Closed
CF
LC
Leicester City Council
PME - Cashless Parking Solution
IT services· Published 16 Jul
CLOSED
05 Jan
—
Estimated
Closed
CF
NH
National Highways
ORT0120 Provision of Miscellaneous OT Parts and Goods LOT 2
Transport equipment· Published 16 Jul
CLOSED
03 Aug
—
Estimated
Closed
CF
DF
Department for Education
Survey of Childcare and Early Years Providers
R&D services· Published 16 Jul
CLOSED
28 Jul
£151k
Estimated
Closed
CF
SG
St. George The Martyr Church
Capital Project Management services for St George the Martyr, Holborn
Architecture & engineering· Published 15 Jul
Page 171 of 8261
PreviousNext